- 14 -
- 11 -
KALVIS-2-16, 2-25, 2-30, 2-40 en 2009.05.18
•
nly persons with necessary qualification are allowed to perform
installation works;
•
Installation works should be performed according to the
prepared project;
5.
Boiler servicing
Adults that are well acquainted with the design and users manual
may service boiler.
5.1. System preparation for heating
Fill system with water and let the air out. Check if valves
disconnecting boiler from the heating system are fully opened and
remove their handles.
5.2. Combustion
(refer to 1 fig.)
Open draught damper (p.15) prior to fuel ignition, ignition damper
(p.14), through doors (p.3) place some dry wood waste and ignite it.
In case of coal combustion 5 - 10 kg of firewood should be covered
by a 10 cm layer of coal. Secondary air dampers (p.18) should be
closed. Dampers are operated when tmeperature in the boiler
reaches 60°C.
Upon fuel ignition chamber may be filled with fuel. Finer fuel
increases boiler capacity.
Wood should be loaded freely, so that it is able to fall down during
combustion.
Coal is addwed in layers, depending on quality and required heat
amount.
When adding fuel:
-
Open ignition damper (p.14);
-
Open doors (p.2) anmd check if the ash allows air inflow
through teh fire grate openings. Move the fuel and close the
door after 15-20seconds if needed;
-
Close the door damper (p.1) with draught adjuster (p.7);
-
Slightly open fuel loading door (p.5), fully open them in 5-10
seconds and add fuel;
-
Close fuel loading doors and dapers tightly;
Содержание K-2-16
Страница 2: ...2...