1. Preparation
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles
will not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a
secure material for the anchoring devices.
Mark the centerline on the floor.
Move the pedestal into position on the marked centerline.
NOTE:
The lavatory
must
be supported by the pedestal.
Apply two self-adhesive gaskets (provided) to each of the three
ribs on the bottom of the basin.
Carefully lift the lavatory into place on the pedestal, and slowly
move the pedestal as required to ensure proper fit.
Level the lavatory.
Locate the two lavatory anchoring holes, and mark the hole
locations on the finished wall.
Carefully remove the lavatory from the pedestal and set aside.
Move the pedestal from the area.
1/2" (1.3 cm) D.
Anchor Holes
33-13/16"
(85.9 cm)
11"
(27.9 cm)
Min
13"
(33 cm)
Max
1-1/4"
OD
3/8"
Hot
Finished Floor
8"
(20.3 cm)
7-7/16"
(18.9 cm)
L of Backing
11-9/16"
(29.4 cm)
7"
(17.8 cm)
Finished Wall
2-3/8" (6 cm)
4-3/4" (12.1 cm)
3" (7.6 cm)
26"-1/2
(67.3 cm)
3/8" Cold
4" (10.2 cm)
4" (10.2 cm)
C
Kallista
3
1036496-2-B
Содержание Tuxedo P72037
Страница 15: ...1036496 2 B...
Страница 16: ...USA Canada 1 888 4 KALLISTA Fax 1 888 272 3094 kallista com 2008 KALLISTA 1036496 2 B...