background image

INSTALLATION INSTRUCTIONS

  Two-Handle Wall-Mount Bath Valve

1085232-2-

A

© 2013 KALLISTA

3 of 4

Questions? Problems? For additional assistance, please contact KALLISTA’s Customer

Service Department at 1-888-4-KALLISTA (1-888-452-5547) or FAX 1-888-272-3094.

ROUghINg-IN  INFORMATION

Top of Bath Rim

2-3/16" 

(56 mm)

Finished Wall

Ø 1-5/8" 

(41 mm) 

Hole

4" (102 mm)

4" (102 mm)

3" (76 mm)

Min

4" (102 mm)

Max

1/2" NPT

1/2" NPT

1/2" NPT

1/2" NPT

4" (102 mm) 

Typical

4" (102 mm) 

Typical

1.  PRePARe The YOke

Valves

Cold

Ceiling Supplies

Plug

Hot

Yoke

Plug

For Ceiling Supplied Installations

 

‰

Turn the yoke over to allow the supplies to connect from the top of the yoke.

NOTe:

 Reversing the yoke for ceiling supplies will reverse the direction in which lever handles close.

 

‰

For proper lever handle operation, remove and reverse the ceramic valves.

 

‰

Make sure the valves are not dirty or damaged.

 

‰

Wrench tighten the valves.

For All Installations

 

‰

Install a 1/2" NPT plug in the appropriate hole in the center of the yoke.

Отзывы: