7
Step 2 - Floor mounting base
Step 3 - Water Supply hoses Connection
Choose the appropriate place to install faucet and drill 50 mm
(2’’) hole in floor.
Use the screws needed for the type on floor to install mounting
base (fig. 2.1 et 2.2).
•
Wood floor covered with ceramic tiles: use anchors if
needed (fig. 2.1).
•
Concrete floor covered with ceramic tiles: drill with cement
bit 5/16’’ (fig. 2.2).
Connect and firmly tighten the supply hoses of the faucet to
the water supplies. The blue supply hose must be connected
to the cold male connection and the red one to the hot male
connection. (fig. 3.1).
Make sure that the two supply hoses are tightly screwed to the
faucet spout and to the water inlets.
Étape 2 - Fixation au plancher
Étape 3 - Raccordement des tuyaux
d’alimentation
Choisir l’endroit approprié pour l’installation du robinet,
percer un trou de 50 mm (2’’) dans le plancher.
Utiliser les vis de fixation nécessaire au type de plancher pour
visser la base de montage au plancher (fig. 2.1 et 2.2).
• Plancher de bois recouvert de céramique : utiliser les
chevilles au besoin (fig. 2.1).
• Plancher de béton recouvert de céramique : percer avec une
mèche de 5/16’’ (fig. 2.2).
Connecter et serrer fermement les tuyaux d’alimentation du
robinet aux entrées d’eau chaude et froide. Le tuyau identifié
de bleu se connecte à l’arrivée d’eau froide et le rouge à
l’arrivée d’eau chaude. (fig. 3.1).
S’assurer que les deux tuyaux d’alimentation sont bien vissées
au bec du robinet et aux arrivées d’eau.
Plancher de bois / Wood floor
Ø 8mm
5/16"
Plancher de ciment / Concrete floor
Plancher de bois / Wood floor
Ø 8mm
5/16"
Plancher de ciment / Concrete floor
CHAUD
HOT
FROID
COLD
fig. 2.1
fig. 2.2
fig. 3.1