background image

   

MO

N

Ž

N

Í N

ÁV

O

D

 

    

   V

A

N

 

      

S  

PA

N

EL

EM

 

 

 
 
 

                      

MONTÁŽ PŘED OBLOŽENOU STĚNU

 

INSTALLATION IN TILED COR- 
NER OF A ROOM 

SITUATION D’INSTALLATION 
DANS UN COIN DEJA CARRELE 
DE LA SALLE 

SITUAZIONE DI INSTALLAZIONE 
IN UN ANGOLO GIA PIAST- 
RELLATO DELLA STANZA DA 
BAGNO 

SITUACIÓN DE MONTAJE EN 
ESQUINAS ALICATADAS 

CZ 

GB  
  F 

 

 

 

 

 

 

 

 

 

       

VYZNAČENÍ POLOHY SIFONU

  

 

DETERMINATION OF SIPHON  
POSITION  

DETERMINATION DE LA POSITION 
DU SIPHON  

DETERMINAZIONE DELLA 
POSIZIONE DEL SIFONE  

DETERMINACIÓN DE LA 
POSICIÓN DEL SIFÓN  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

9  

Содержание DUO POOL 150 Series

Страница 1: ...MONT N N VOD VANY S PANELEM Installation instructions Instructions d installation Instruzioni di montaggio Instrucciones de montaje...

Страница 2: ...esm b t reprodukov na nebo kop rov na bez v slovn ho souhlasu firmy Kaldewei CZ GB F I E Vanu s panelem p epravujte jen v p epravn m obalu a vylu te nep im en zat en Za kody vznikl v d sledku nevhodn...

Страница 3: ...rwise without the express approval of Kaldewei CZ GB F I E Transport the bathtub with panelling in its transport box only and avoid improper loads Kaldewei shall not assume any liability for damage in...

Страница 4: ...ne autre mani re CZ GB F I E Ne transporter la baignoire avec rev te ment que dans l emballage de livraison et viter alors des charges non ad quates Kaldewei n assume aucune responsabi lit pour des do...

Страница 5: ...ssa autorizzazione della Kaldewei CZ GB F I E Trasportare la vasca con rivestimento solo nell imballaggio originale edevitare qualsiasi sollecitazione che possa dan neggiarlo La Kaldewei declina quals...

Страница 6: ...presa Kaldewei CZ GB F I E Transporte la ba era con revestimiento nicamente en el embalaje de suministro y procure no poner encima cargas pesa das Kaldewei no se responsabiliza de los da os originados...

Страница 7: ...MONT N N VOD VANY S PANELEM CZ GB F I E 6...

Страница 8: ...AISON VOLUMEDIFORNITURA ART CULOSINCLUIDOSENLA ENTREGA DUOPOOLMod 150 CZ GB F I E OBSAH DOD VKY SCOPEOFSUPPLY TENDUEDELIVRAISON VOLUMEDIFORNITURA ART CULOSINCLUIDOSENLA ENTREGA STUDIO Mod 826 STUDIO S...

Страница 9: ...ECESSARI HERRAMIENTASNECESARIAS CZ GB F I E MONT P ED HRUBOU ST NU S OBKLADEM INSTALLATIONINFRONTOF THEBAREWALL TILING SITUATIOND INSTALLATION DEVANTUNMURBRUT A CARRELER SITUAZIONEDIINSTALLAZIONE DAVA...

Страница 10: ...NCOIN DEJACARRELE DELASALLE SITUAZIONEDIINSTALLAZIONE INUNANGOLOGIA PIAST RELLATODELLASTANZADA BAGNO SITUACI NDEMONTAJEEN ESQUINASALICATADAS CZ GB F I E VYZNA EN POLOHY SIFONU DETERMINATIONOFSIPHON PO...

Страница 11: ...RRIER COUPEDUSUPPORTDE LA BAIGNOIRE TAGLIODELSUPPORTODELLA VASCA DA BAGNO CORTEAMEDIDADELSOPOR TEDELABA ERA CZ GB F I E KONTROLA MONT N POLOHY INSTALLATIONCHECK VERIFICATIONDELASITUATION D INSTALLATIO...

Страница 12: ...LAGE DU SUPPORT DE LA BAIGNOIRE INCOLLAMENTODELSUPPOR TODELLA VASCA DABAGNO ADHESI NDELSOPORTEDE LABA ERA CZ GB F I E USAZEN POLYSTYR NOB HO NOSI E ALIGNMENT OF BATHTUBCAR RIER ALIGNAGE DUSUPPORTDELA...

Страница 13: ...IRE PREPARAZIONEDELLAVASCA DABAGNO PREPARACI NDELABA ERA CZ GB F I E USAZEN VANY A P POJEN SIFONU INSTALLATIONOFBATHTUB ANDCONNECTIONOFSIPHON MISE ENPLACE DE LABAIG NOIREETRACCORDEMENTDU SIPHON POSADE...

Страница 14: ...VANY ALIGNMENTOFBATHTUB ALIGNAGEDELABAIGNOIRE ALLINEAMENTODELLAVASCA DABAGNO ALINEACI NDELABA ERA CZ GB F I E MONT PANEL FITTINGOFTHEPANELLING SYSTEM MISE ENPLACE DUREVETE MENT MONTAGGIODELRIVESTIMEN...

Страница 15: ...OFTHEPANELLING SYSTEM MISE ENPLACE DUREVETE MENT MONTAGGIODELRIVESTIMEN TO COLOCACI NDELREVESTI MIENTO CZ GB F I E SP ROV N VANY JOINTING THEBATHTUB JOINTOIEMENT DELABAIG NOIRE RIFINITURA DELLE COMMES...

Страница 16: ...216 155 02 2007 Franz Kaldewei GmbH Co KG Beckumer Stra e 33 35 59229 Ahlen Germany Tel 49 2382 785 0 Fax 49 2382 785 200 Internet www kaldewei com...

Отзывы: