background image

© 2019 Jetta Corporation. All rights reserved. REV 04/2019

WWW.JETTACORP.COM

 

1(800) 288-7771

 

INSTALLATION INSTRUCTIONS | JETTA CORPORATION 

PAGE | 1 

INSPECTION & INSTALLATION 
INSTRUCTIONS 

DADOquartz

®

 COLLECTION

(800) 288-7771

|  

WWW.JETTACORP.COM

Содержание DADOquartz Series

Страница 1: ...poration All rights reserved REV 04 2019 WWW JETTACORP COM 1 800 288 7771 INSTALLATION INSTRUCTIONS JETTA CORPORATION PAGE 1 INSPECTION INSTALLATION INSTRUCTIONS DADOquartz COLLECTION 800 288 7771 WWW...

Страница 2: ...ENTS GENERAL INSTALLATION INSTRUCTIONS 3 INSPECTION 3 GENERAL INSTALLATION INSTRUCTIONS 3 ROUGH IN 4 SITE PREPERATION 4 PREPARATIONS 4 FREESTANDING INSTALLATION INSTRUCTIONS 5 2019 Jetta Corporation A...

Страница 3: ...thoroughly for accuracy or damage o Check to ensure the bathtub is the unit you ordered and that its dimensions and drain position correspond to your plans o To prevent scratches always protect the s...

Страница 4: ...this space o The plumbing rough in for both the drain and the supply lines should be completed by a licensed plumber before the bathtub is moved into its final position PREPARATIONS Before installing...

Страница 5: ...e place to install floor drain according to guidelines Reposition the bathtub and ensure that the trace lines are followed 2 Drill a 4 hole in your wooden subfloor or leave a 6 x 6 open space in your...

Страница 6: ...channel lock plier 12 Apply provided lubricant inside the Drain kit Please only proceed with this step once the pressure test has been performed if needed 13 Affix the appropriate tailpiece to the wa...

Страница 7: ...e Drain Kit 15 With caution slowly insert the bath tub tailpiece into the Drain Kit 17 Water test the bathtub for leaks If unit is within the limited factory warranty contact Jetta Corporation at 800...

Отзывы: