OPzV Battery Operation Manual

14

Part Three Battery Installation

1 Unpacking and Inspection

1.1 Inspection: Open the shipping containers and check the contents for damage and against

the packing list. Immediately inform the sales department of any damaged or missing item

1.2 Reference-installation drawing and operation manual;
1.3 Measure: measure the open circuit voltage of battery, and the battery can’t be installed if

open circuit voltage is lower than 2.0V/cell.

2 Installation Precautions

2.1 Fix the battery to avoid vibration and shock;
2.2 Combustible gas(hydrogen) will be generated during charge and storage, so keep the

battery away from spark source (like switch and fuse);

2.3 Do not use sealed container or container within which combustible gases easily

accumulate;

2.4 When internal installation is required, place battery at the bottom of the equipment to

avoid overheating. Beside, contact with the inner wall of the equipment and other batteries should
be avoided;

2.5 Keep the battery away from heating things (such as a transformer).

3 Installation and Wiring

3.1 Wrap the metal mounting tool(such as spanner) with insulating tape;
3.2 If batteries are mounted in KAISE ’ rack, Install rack according to KAISE ’ r a c k

installation guide.

3.3 Connect battery connector between the batteries, then connect the battery string to

charger or load;

Be sure to tighten the screws to avoid fire incidents, and the allowable set value of M6

terminal torque is 6

8 N

m, M8 terminal torque is 10

12N

m.

If the terminal has L-copper, check the crew between the L-copper and terminal is screwed up

before connecting batteries; if not, be sure to Tighten the screws.

3.5 A quantity of anti-rust is spread on the terminal surface of the battery before or after the

installation;

3.6 After battery installation, check total voltage of battery string before power on;
3.7 After finishing installing the batteries, If the site is not open temporarily, be sure to cut off

the connection between the batteries and the system to avoid overdischarge.

Содержание OPZV Series

Страница 1: ...OPZV SERIES TUBULAR GEL BATTERY OPERATION MANUAL Version 1 1...

Страница 2: ...2 3 Working Principle 3 PART TWO OPERATION AND MAINTENANCE 4 1 Operation Condition 4 2 Capacity 4 3 Temperature 5 4 Charge and discharge requirements 7 5 Storage 10 6 Maintenance 10 PART THREE BATTER...

Страница 3: ...ction The batteries for replacement should be used as the same as the old ones in model and type Warning Do not smoke or use fire near batteries Warning Do not use any organic cleanser to clean batter...

Страница 4: ...l formula active material Valve Made of acid proof aging proof synthetic rubber Flame arrestor With acid proof explosive proof functions 2 Product Specifications Model Nominal Voltage V Capacity Ah 10...

Страница 5: ...eparator to set up oxygen cycle principle Battery is full of gel electrolyte inside and A 3 D porous network is formed with framework of SiO2 The net contains electrolyte necessary for battery At init...

Страница 6: ...y The capacity can be expressed in Rated Capacity or Actual Capacity The Rated Capacity please sees Table 1 1 The Actual Capacity is the product of the discharge current and the discharge time the uni...

Страница 7: ...0 2C 1 80 0 2C I 0 6C 1 75 0 6C I 1 0C 1 70 1C I 2C 1 60 3 Temperature 3 1 Available Capacity vs Ambient Temperature Temperature affects capacity of the battery Fig 3 1 is the available capacity curve...

Страница 8: ...y at 25 And temperature compensation coefficient is 3Mv cell Table 3 3 Floating Voltage of VRLA Battery 25 Series Floating voltage V cell OPzV 2 23 0 02 The formula to calculate float voltage at diffe...

Страница 9: ...tes performance of VRLA battery is bad it s liable to cause thermal run away when heat accumulates Please improve ventilation and temperature condition when room temperature is high The distances betw...

Страница 10: ...ging time reached 16 hours Recharging Procedure 1 Connect the batteries in series with cables or copper bars and make sure that all the screws tightened with each joint then connect the positive of ba...

Страница 11: ...capacity if it is still less than 80 of rated capacity then the battery already fails Charging Equipment and Tools No Tool Explanation Purpose 1 Battery Test Equipment or Power System If there is no...

Страница 12: ...ge is lower than 2 08V cell or have been stored for long time the batteries should be charged to avoid damage caused by self discharge Storage temperature Longest interval over 30 once 6 months under...

Страница 13: ...ound Quarterly Maintenance Yearly Maintenance Items Details Benchmarks Maintenance Items Details Benchmarks Maintenance Float voltage for each battery Measure the voltage of each battery under floatin...

Страница 14: ...ow or not compensate according to temperature the battery system will in an insufficient charge state for a long period of time When the electricity is out the battery may not be able to work because...

Страница 15: ...me after discharge If the battery is put aside without charge for a long time after discharge it will affect the capacity and life of the battery Because in the negative some large size PbSO4 will be...

Страница 16: ...nner wall of the equipment and other batteries should be avoided 2 5 Keep the battery away from heating things such as a transformer 3 Installation and Wiring 3 1 Wrap the metal mounting tool such as...

Страница 17: ...lgroup com Tel 51 12 719445 www tempelgroup com Tempel Group en el mundo BARCELONA MADRID VALENCIA BILBAO SEVILLA LISBOA PORTO BUENOS AIRES LIMA SANTIAGO DE CHILE BOGOT SA PAULO M XICO DF CIUDAD DE PA...

Отзывы: