Test Operation
MLCAC-UTSM-2010-10
134
Installation
7. Test Operation
(1) The test operation must be carried out after the entire installation has been completed.
(2) Please confirm the following points before the test operation.
The indoor unit and outdoor unit are installed properly.
Tubing and wiring are correctly completed.
The refrigerant pipe system is leakage-checked.
The drainage is unimpeded.
The ground wiring is connected correctly.
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
The power voltage fits the rated voltage of the air conditioner.
There is no obstacle at the outlet and inlet of the outdoor and indoor units.
The gas-side and liquid-side stop values are both opened.
The air conditioner is pre-heated by turning on the power.
(3) According to the user's requirement, install the remote controller when the remote controller's
signal can reach the indoor unit smoothly.
(4) Test operation
Set the air conditioner under the mode of "COOLING" with the remote controller, and check the following
points.
Indoor unit
Whether the switch on the remote controller works well.
Whether the buttons on the remote controller works well.
Whether the air flow louver moves normally.
Whether the room temperature is adjusted well.
Whether the indicator lights normally.
Whether the temporary buttons works well.
Whether the drainage is normal.
Whether there is vibration or abnormal noise during operation.
Outdoor unit
Whether there is vibration or abnormal noise during operation.
Whether the generated wind, noise, or condensed of by the air conditioner have influenced your
neighborhood.
Whether any of the refrigerant is leaked.
Содержание KOU-12HDN1
Страница 1: ...Service Manual 2010...
Страница 2: ......
Страница 4: ......
Страница 15: ...MLCAC UTSM 2010 10 Dimensions New Four way Cassette Compact 11 3 Dimensions 4 Service Space...
Страница 20: ...Field Wiring MLCAC UTSM 2010 10 16 New Four way Cassette Compact 11 Field Wiring KCA2 12HRDN1 Q KCA2 18HRDN1 Q...
Страница 21: ...MLCAC UTSM 2010 10 Field Wiring New Four way Cassette Compact 17 KCA2 12HRDN1 Q KCA2 18HRDN1 Q...
Страница 30: ...Service Space MLCAC UTSM 2010 10 26 Four way Cassette Type 4 Service Space For 18 48k For 60k...
Страница 36: ...The Specification of Power MLCAC UTSM 2010 10 32 Four way Cassette Type 10 The Specification of Power...
Страница 37: ...MLCAC UTSM 2010 10 Field Wiring Four way Cassette Type 33 11 Field Wiring Wiring chart...
Страница 38: ...Field Wiring MLCAC UTSM 2010 10 34 Four way Cassette Type...
Страница 52: ...The Specification of Power MLCAC UTSM 2010 10 48 Duct Type 10 The Specification of Power...
Страница 53: ...MLCAC UTSM 2010 10 Field Wiring Duct Type 49 11 Field Wiring...
Страница 54: ...Field Wiring MLCAC UTSM 2010 10 50 Duct Type Air conditioner link circuit...
Страница 55: ...MLCAC UTSM 2010 10 Field Wiring Duct Type 51...
Страница 56: ...Field Wiring MLCAC UTSM 2010 10 52 Duct Type...
Страница 64: ...Service Space MLCAC UTSM 2010 10 60 Ceiling Floor Type 4 Service Space...
Страница 65: ...MLCAC UTSM 2010 10 Wiring Diagrams Ceiling Floor Type 61 5 Wiring Diagrams KUB 12HRDN1...
Страница 72: ...The Specification of Power MLCAC UTSM 2010 10 68 Ceiling Floor Type 10 The Specification of Power...
Страница 73: ...MLCAC UTSM 2010 10 Field Wiring Ceiling Floor Type 69 11 Field Wiring...
Страница 74: ...Field Wiring MLCAC UTSM 2010 10 70 Ceiling Floor Type...
Страница 75: ...MLCAC UTSM 2010 10 Field Wiring Ceiling Floor Type 71...
Страница 79: ...MLCAC UTSM 2010 10 Dimensions Console Type 75 3 Dimensions KFA 12HRDN1 KFA 18HRDN1...
Страница 80: ...Service Space MLCAC UTSM 2010 10 76 Console Type 4 Service Space...
Страница 86: ...The Specification of Power MLCAC UTSM 2010 10 82 Console Type 10 The Specification of Power...
Страница 87: ...MLCAC UTSM 2010 10 Field Wiring Console Type 83 11 Field Wiring...
Страница 88: ...Field Wiring MLCAC UTSM 2010 10 84 Console Type...
Страница 89: ......
Страница 97: ...MLCAC UTSM 2010 10 Service Space Outdoor Units 93 3 Service Space...
Страница 99: ...MLCAC UTSM 2010 10 Wiring Diagrams Outdoor Units 95 5 Wiring Diagrams KOU 12HDN1...
Страница 100: ...Wiring Diagrams MLCAC UTSM 2010 10 96 Outdoor Units KOUA 18HDN1 C0 KOUB 24HDN1...
Страница 101: ...MLCAC UTSM 2010 10 Wiring Diagrams Outdoor Units 97 KOU 30HDN1 KOU 36HDN1 KOU 48HDN1...
Страница 102: ...Wiring Diagrams MLCAC UTSM 2010 10 98 Outdoor Units KOUB 36HDN1 R KOUB 48HDN1 R KOUA 60HRDN1...
Страница 103: ...MLCAC UTSM 2010 10 Wiring Diagrams Outdoor Units 99 KOUD 60HDN1 R...
Страница 110: ...Troubleshooting MLCAC UTSM 2010 10 106 Outdoor Units...
Страница 139: ...MLCAC UTSM 2010 10 Control Control 135 Part 5 Control 1 Wireless Remote Controller 136...