background image

Instruction manual  Kabola KB-Series version 6,  2018

19

6 Cleaning and maintenance

6.1 Points for attention

Spare parts must be ordered through your Kabola supplier. For warranty purposes only original spare 
parts must be used. When ordering spare parts, state the type of boiler and its serial number. Your 
Kabola supplier will then be able to supply the correct parts. In Appendix B, the main spare parts are 
listed.

6.2 Cleaning and maintenance

Warning: 

Maintenance and repairs should only take place when the boiler is switched 
off, this is because the boiler may start unexpectedly. Take the plug form the 
wall socket for the 230 VAC versions. 

Warning: 

Maintenance and repairs may only be performed by personnel, who have read 
and understood the information in this manual, preferably an expert installer 
or a service engineer from Kabola Heating Systems.

Every year

1. Clean the boiler

1.1. Remove the burner with the door from the boiler;
1.2. Remove the insulation.
1.3. Clean the inside of the boiler, using a stiff brush;

 

 Attention:

  Don’t use any aggressive solvents like thinner or gasoline.

1.4. Clean the boiler with a vacuum cleaner;
1.5. Replace the isolation;
1.6. Replace the door with burner;

2. Clean the chimney;
3. Change the oil filter element;
4. Clean the burner (see manual of the burner)

Attention:

The old oil filter element has to be processed as chemical waste.

7 End of life of the boiler

When the boiler is scrapped, take note of the points listed below:

Process the oil filter and the oil hose as chemical waste;

Separate the metal from the plastic parts and dispose of them separately.

Process any excess oil in an environmentally friendly way.

Transport the boiler according to the instructions in chapter 3

Recycle this manual.

Содержание Ecoline series

Страница 1: ...User manual KB ECOLINE series English Ecoline serie CH Calorifier Combi...

Страница 2: ...ions that can be identified in the following way Hint This gives the user suggestions and advises to facilitate the execution of certain tasks Attention Additional information is supplied to the user...

Страница 3: ...stem and domestic hot water 8 4 1 3 Flue gas outlet 9 4 1 4 Electrical connection 12 4 1 5 Filling the central heating system 14 4 1 6 Mounting the oil filter and oil burner 15 4 2 Starting your syste...

Страница 4: ...and for a central heating system The boilers can also be used for the generation of domestic hot water generated by a compact brazed heat exchanger The dimensions of the rooms to be heated have to be...

Страница 5: ...ions In this chapter we emphasis the safety related points for operating the boiler MEASURES FOR A SAFE INSTALLATION Don t store any flammable and or gaseous products in the room where the boiler is i...

Страница 6: ...fuel system While transporting the boiler take following precautions Don t damage the boiler use a blanket to cover the boiler Transport the boiler standing up 3 2 Storage Take the following precauti...

Страница 7: ...Fitting the boiler Install the boiler in a dry place Install the boiler on a firm horizontal base Make sure there is sufficient supply of fresh air in the room where the boiler is installed see hint...

Страница 8: ...r Attention Install a bleeding point near the boiler especially when the piping does not go up Installation KB CH Connect the piping to the boiler as follows see figure 2 2 2 1 Install the feed of the...

Страница 9: ...e return of the boiler and Calorifier on nr 2 3 Install the feed of the boiler on 3 A 4 Install the fill and pressure gauge on nr 4 5 The numbers A and B you will find on the housing of the three way...

Страница 10: ...sulate the flue with heat resistant material on those parts where contact with human body parts is possible For a correct flue gas outlet the following points need to be observed Use the proper diamet...

Страница 11: ...nter large angles of heel through waves and under sail For this kind of flue gas outlet the following points are important Install a proper storm cowl on top of the chimney this must stop rain from en...

Страница 12: ...e boiler before you start the installation The quality of 230 VAC power supply to the boiler should be as good as the power supply from a land line To connect the room thermostat for KB Standard Remov...

Страница 13: ...B4 in connection A figure 11 at the backside of the dashboard as shown on the sticker inside the connector Connect the wires inside the room thermostat Fig 6 1 to Q14 T1 and Q11 T2 Connect the Frost...

Страница 14: ...m can be filled with cooling fluid suited for CH systems pH value 8 5 Bleeding the circulation pump Adjust the temperature of the room thermostat higher than the ambient temperature for example 5 degr...

Страница 15: ...version 2 Switch the boiler on at the on off switch on the control panel The lamp in the switch indicate that the system is on 3 Set the room thermostat see manual of the room thermostat 4 Open the va...

Страница 16: ...oom thermostat If problems arise with the operation of the boiler you will find a list of possible problems and solutions in Appendix C 5 1 Explanation of the dashboard KB series Boiler Display On off...

Страница 17: ...stand by Circulationpump not active 1 Room thermostat is demanding Circulation pump active 2 Hot water is being tapped or external boiler requires heat Circulation pump active 3 Pumptimer active Circu...

Страница 18: ...you just want to use tap water and no heating you ll have to proceed the following steps 1 If the tap is visible at the display of the room thermostat than the tap water is switched on If not it s sw...

Страница 19: ...anual preferably an expert installer or a service engineer from Kabola Heating Systems Every year 1 Clean the boiler 1 1 Remove the burner with the door from the boiler 1 2 Remove the insulation 1 3 C...

Страница 20: ...Instruction manual Kabola KB Series version 6 2018 20 Appendix A Technical specifications...

Страница 21: ...Instruction manual Kabola KB Series version 6 2018 21 Appendix B Electrical diagram 230 V...

Страница 22: ...Instruction manual Kabola KB Series version 6 2018 22 Appendix B Electrical diagram 230 V...

Страница 23: ...of flame at the end of safety time Faulty or soiled fuel valves Faulty or soiled flame detector Poor adjustment of burner no fuel Faulty ignition equipment 3x blinks alarm on terminal 10 Free 4 blink...

Страница 24: ...Instruction manual Kabola KB Series version 6 2018 24 Appendix D Boiler parts model 2012 2016...

Страница 25: ...Instruction manual Kabola KB Series version 6 2018 25 Appendix D Boiler parts model 10 2016 2017 Spareparts list model 2012 2016...

Страница 26: ...7 Feed burner control LOA24 52 007 18 Burner connector 7 pole KB series 52 008 19 Burner controlt LOA24 52 009 20 Motor 70 watt 52 010 21 Bearing plate for oil pump motor 52 011 22 Oilpump coupling KB...

Страница 27: ...24 x063 44 Knee type221 1 18 S482 45 Conversion ring 1 bui x bin 18 S297 46 Pipe nipple x 120 mm 18 S483 47 48 Fill and pressure gauge 9 I015 50 Tap casing 51 Back of tap casing 52 Heat exchanger 24 x...

Страница 28: ...Instruction manual Kabola KB Series version 6 2018 28 Spareparts list model 2016 2017...

Страница 29: ...er our own responsibility that the product Kabola KB20 KB40 KB45 KB50 KB75 combi 230V to which this declaration relates complies with the fol owing standards EN 303 1 EN 303 2 EN 304 EN 50081 1 EN 500...

Страница 30: ...Instruction manual Kabola KB Series version 6 2018 30 Appendix F CE declaration...

Страница 31: ...Instruction manual Kabola KB Series version 6 2018 31 Warranty Conditions...

Страница 32: ...Instruction manual Kabola KB Series version 6 2018 32 Appendix G Guarantee conditions...

Отзывы: