background image

8

InsTallaTIon of generaTor Cable and Cable guIdes

1�  Place the generator cable into the dial ring housing recess containing a post 

used for positioning the cable� (See diagrams in Appendix B�) The hole in the 

cable must be positioned over the post on the dial ring, and the five gold tabs 

must be visible�

2�  The Zebra connector and Zebra connector housing are assembled at the factory 

but may come apart during shipment� If so, insert the Zebra connector into the 

Zebra connector housing before proceeding�

CAUTION: 

The Zebra connector is an electrical 

connector. Keep it clean!

3�  Place the Zebra connector  and connector 

housing over the generator cable, and press 

it into the recess� The hole in the Zebra 

connector housing must be positioned over 

the post in the dial ring� Be sure the black 

Zebra connector housing is positioned as 

shown in Figure 14� 

4�  Install at least one of the stick-on cable 

guides in an appropriate position to restrain 

the cables� (See Figure 15 for possible locations�)

5�  Route the cables through the cable guide that was just installed�

figure 13 - lCd and ZIf Connectors

figure 14 - Zebra assembly 

Содержание X-10

Страница 1: ...INSTALLATION INSTRUCTIONS X 10TM Type 1F HIGH SECURITY ELECTRONIC LOCK...

Страница 2: ...es 7 Installation of Generator Cable and Cable Guides 8 Installation of the Dial Ring Cover 9 Cutting and Installing the Spindle 9 Installation of the Dial Hub and Dial 10 Final Installation 12 Instal...

Страница 3: ...iver 30 inch pound capacity or 8 Standard torque wrench with screwdriver bits Note See table of recommended torques for the various X 10 lock screws All other necessary tools and materials are provide...

Страница 4: ...unting Screws Two sets 4 each English and Metric 9 Stick on Cable Guides 3 10 Zebra Connector Zebra Connector Housing 11 Lubricant Lubriplate 12 Dial Hub Locating Gauge 13 Hex Key 5 64 14 Spindle Scre...

Страница 5: ...to fit most industry standard container lock mounting screw hole patterns the need to use this template should be minimal Note The above template is NOT Actual Size Do Not Use for locating drilling a...

Страница 6: ...les for the lock case and the dial ring when necessary 2 The lock case mounting screws require drilled and tapped 1 4 20 screw holes M6X1 if Metric 3 The dial ring mounting screws require drilled and...

Страница 7: ...ted position use a 6 inch scale or ruler to measure 5 16 inch from the container wall and mark the outer tube at this length 3 Remove the lock case from the container and remove the outer tube for cut...

Страница 8: ...iscarded must also be from the plain unnotched end of the tube Installation of the lock 1 Place the inner tube into the lock case tube retainer Make sure the cutout in the tube aligns with the cables...

Страница 9: ...ke sure the tubes are seated in the tube retainer on the dial ring 4 Attach the dial ring to the container with the dial ring mounting screws and tighten to the specified torque See Page 1 Installatio...

Страница 10: ...the Zebra connector housing before proceeding CAUTION The Zebra connector is an electrical connector Keep it clean 3 Place the Zebra connector and connector housing over the generator cable and press...

Страница 11: ...responding slots in the dial ring See Figures 15 and 16 2 Carefully slide the dial ring cover into the dial ring 3 Hold the dial ring cover in place and tighten the two dial ring cover mounting screws...

Страница 12: ...cifications see Page 1 2 Apply lubricant to the hub bearing surface See Figure 19 3 Make a bend in the dial hub locating gauge at its midpoint This will keep it from acting as a spring as the hub is p...

Страница 13: ...equal amount of the retaining ring is exposed around the hub The dial should slide easily into place on the hub without interference from the retaining ring See Figure 24 8 Ensure that the 5 sided fla...

Страница 14: ...ticker from the back of the lock when the container has been placed in use 3 Make sure the bolt is fully retracted 4 Tighten the spindle screw to the torque specifications See Page 1 Installation comp...

Страница 15: ...factory combination 25 Stop on 25 and pause briefly 4 Dial left CCW to the first number of the factory combination 50 Stop on 50 and pause briefly 5 Dial right CW After OP with a right arrow OPen righ...

Страница 16: ...st be positioned so the cables come through the notch in the retainer NOTCH shown in position 3 While facing the outside of the container position the notch in the tube retainer as follows Bolt Positi...

Страница 17: ...routing paths to avoid pinching or rubbing of cables Choose the diagram that most closely represents the thickness of the container door Ensure the cables are routed so that they do not get pinched by...

Страница 18: ...16 Notes...

Страница 19: ...17 Notes...

Страница 20: ...tice The information in this manual is subject to change without notice and does not represent a commitment on the part of Kaba Mas Kaba Mas shall not be liable for technical or editorial errors or om...

Отзывы: