8
P
ART
III: I
NTERCONNECT
B
OX
I
NSTALLATION
(O
PTIONAL
)
NOTE:
All connections made to the lock are keyed by plastic ribs on the side of
the connectors. Strain relief should be applied to all cables as necessary.
1. Attach the 8 pin serial connector to the lock case and then to the Interconnect
Box.
2. Attach 4-Pin cable to the 4-Pin port on the lock and the other end to the
Interconnect Box (Figure 4).
3. Take the double sided taped provided and mount the Interconnect Box in a
suitable location
Figure 4 - Interconnect Box Cables
4. Double check all cables are inserted into the correct slots on the lock and
Interconnect Box (Figure 6).
5 Remove front entry assembly from container by gently pushing in and up on
the unit until it slides off of the 2 bolts. Do not tug on the cables unnecessarily.
6. Place 2 new fresh alkaline 9 V batteries into the 2 slots, connecting the
terminals to the provided connectors (Figure 7).
7. Replace entry assembly by pressing in and down over the 2 extruded bolts,
taking care that the cables are not pinched.
Figure 6
Figure 7