Left open
1. Check door thickness and Door Frame.
Door drill hole map
2. Check door open direction.
Door frame≧4
Door thickness:
Right open
(10mm)
(25mm)
5
2
(6 8mm)
3
2
(5 4mm)
8
1
2
2
(6 0mm)
8
3
2
(5 8mm)
7
2
2
(2 7mm)
16
1
1
1
Door Preparation
Packing List
A
G
H
I
J
K
B
C
D
E
F
L
M
(10mm)
5
2
(3 0mm)
11
2
1
(4 0mm)
7
4
1
(25mm)
1
(25mm)
1
01
Contents
Door Preparation..........................01
Packing List...................................01
Installation Diagram................02-04
Feartures.......................................05
Product Profile..............................05
App Operarion Guide..............06-08
Operation Instructions............08-10
FQA...........................................10-11
Important Safeguards..................11
10
3
2
1
1
10
9
-1
(110mm)
(38-48mm)
1
2
3
4
5
6
7
8
9
*
0
#