background image

KP-0200-1 Rev f (10-2010) DCN0536                                     

    

 

 

 

 

16 

VI.   WARRANTY STATEMENT

 

5 YEAR WARRANTY FOR: 

KM26 Magnetic Liquid Level Gauges, Buoyancy Level Switches (LS20, MS50, MS10 & MS8), Magnetic Level Switches (MS30, 
MS21, MS40, MS41, PS35 & PS45), EC External Chambers and ST95 Seal Pots.  
 

3 YEAR WARRANTY FOR: 

KCAP300 & KCAP 400 capacitance switches. 
 

2 YEAR WARRANTY FOR: 

AT100  and  AT200  series  transmitters;  VF20  and  VF30  vibrating  fork  switches;  RLT100  and  RLT200  reed  switch  level  
transmitters;    TX,  TS,  TQ,  IX  and  IM  thermal  dispersion  switches;  IR10  and  PP10  External  Relays;  MT2000  radar  level 
transmitters; KP paddle switches; A02, A75 & A77 RF capacitance level switches and A38 RF capacitance level transmitters. 
 

1 YEAR WARRANTY FOR: 

KM50 gauging device; AT500 and AT600 series transmitters; LaserM and SureShot series laser transmitters; LPM 100 and 200 
series  digital  indicators;  DPM100  digital  indicators;  APM100  analog  indicators;  KVIEW series digital indicators and controllers; 
SF50  and  SF60  vibrating  fork  switches,  KB  Electro-Mechanical  Continuous  Measuring  Devices,  KSONIK  ultrasonic  level 
switches, transmitters & transducers. 
 

SPECIAL WARRANTY CONSIDERATIONS:

 

K-TEK does not honor OEM warranties for items not manufactured by K-TEK (i.e. Palm Pilots).  These claims should be handled 
directly with the OEM. 
 
K-TEK will repair or replace, at K-TEK’s election, defective items which are returned to K-TEK by the original purchaser within the 
period specified above from the 

shipment  date 

of the item and which is found, upon examination by K-TEK, to its satisfaction, to 

contain defects in materials or workmanship which arose only under normal use and service and which were not the result of 
either  alterations,  misuse,  abuse,  improper  or  inadequate  adjustments,  applications  or  servicing  of  the  product.   

K-TEK’s 

warranty does not include onsite repair or services.  

Field service rates can be supplied on request. 

 
If a product is believed to be defective, the original purchaser shall notify K-TEK and request a Returned Material Authorization 
before returning the material to K-TEK, with transportation 

prepaid

 by the purchaser.  (Request door to door delivery via New 

Orleans International Airport located in Louisiana, USA.)  The product, with repaired or replaced parts, shall be returned to the 
purchaser  at  any  point  in  the  world  with  transportation  prepaid  by  K-TEK  for  best-way  transportation  only.    K-TEK  is  not 
responsible  for  expedited  shipping  charges.    If  the  product  is  shipped  to  K-TEK  freight  collect,  then  it  will  be  returned  to  the 
customer freight collect. 
 
If  inspection  by  K-TEK  does  not  disclose  any  defects  in  material  or  workmanship,  K-TEK’s  normal  charges  for  repair  and 
shipment shall apply (minimum 250.00 USD). 
 
The materials of construction for all K-TEK products are clearly specified and it is the responsibility of the purchaser to determine 
the compatibility of the materials for the application.   
 
THE FOREGOING WARRANTY IS K-TEK'S SOLE WARRANTY AND ALL OTHER WARRANTIES EXPRESSED, IMPLIED, OR 
STATUTORY,  INCLUDING  ANY  IMPLIED  WARRANTY  OF  MERCHANTABILITY  OF  FITNESS  FOR  A  PARTICULAR 
PURPOSE,  ARE  EXCLUDED  AND  NEGATED  TO  THE  MAXIMUM  EXTENT  PERMITTED  BY  LAW.    NO  PERSON  OR 
REPRESENTATIVE  IS  AUTHORIZED  TO  EXTEND  ANY  OTHER  WARRANTY  OR  CREATE  FOR  K-TEK  ANY  OTHER 
LIABILITY IN CONNECTION WITH THE SALE OF K-TEK’S PRODUCTS.  THE REMEDIES SET FORTH IN THIS WARRANTY 
ARE  EXCLUSIVE  OF  ALL  OTHER  REMEDIES  AGAINST  K-TEK.    K-TEK  SHALL  NOT  BE  LIABLE  FOR  ANY 
CONSEQUENTIAL,  INCIDENTAL,  OR  SPECIAL  DAMAGES  OF  ANY  KIND.    K-TEK’S  SOLE  OBLIGATION  SHALL  BE  TO 
REPAIR OR REPLACE PARTS (FOUND TO BE DEFECTIVE IN MATERIALS OR WORKMANSHIP) WHICH ARE RETURNED 
BY THE PURCHASER TO K-TEK. 

Содержание KP

Страница 1: ......

Страница 2: ... D Side Bin Wall Mounting 6 E Top Bin Wall Mounting 7 F Wiring Connections 8 II OPERATION 8 A Principle of Operation 11 B Maintenance Requirements 11 III REPLACEMENT PARTS 11 IV INTERNAL ASSEMBLY REPLACEMENT 12 A Old Internal Assembly Removal 12 B New Internal Assembly Installation 13 V STANDARD CONFIGURATIONS 15 VI WARRANTY STATEMENT 16 ...

Страница 3: ...ENCE D ATMOSPHERE EXPLOSIF OU SI L APPAREIL EST EN SERVICE 0036 D SERIAL NUMBER DESIGNATION SERIAL NUMBER IS DEFINED BY THE JOB NUMBER JOB NUMBER FORMAT IS AS FOLLOWS YYMM NNNN WHERE YY LAST TWO DIGITS OF YEAR MM NUMBER OF MONTH NNNN SEQUENTIAL NUMBER A INSTRUMENT VOLTAGE EITHER BOX MARKED PER MOTOR VOLTAGE C CONFIGURATION DETAILS MARKED EITHER MP2 OR MP4 FOR MOUNTING FLANGE TYPE MARKED EITHER CS ...

Страница 4: ...nge must be transferred to the installation location on the bin wall and then drilled and tapped for 20 bolts Centered within the bolt circle a 5 1 2 diameter opening must be cut out of the bin wall to allow for clear passage of the paddle See be low an illustration of the required surface preparation The other option for mounting the paddle switch is to use only the threaded portion of the lower ...

Страница 5: ... punch or a 0 125 wide flat screwdriver to drive the paddle pin out of the paddle shaft for paddle removal Step 3 Gently tap in roll pin with hammer Step 1 Slide paddle center bar over paddle switch stub shaft Step 2 Piece of 2x4 or similar for support if possible CAUTION Do not hammer paddle onto switch stub shaft It should slide on easily If not clean all mating surfaces Figure 1 Roll Pin Align ...

Страница 6: ...n wall to reduce vibration transmission 3 Screw in the six mounting bolts and tighten The final assembly should be installed as per Figure 2 4 If a half pipe coupling fitting is to be used the paddle must be removed prior to insertion and assem bled after the paddle housing is secured to the bin wall Note Special care should be taken to en sure that the paddle assembly is tightened into the pipe c...

Страница 7: ...h the 5 1 2 clear opening and align the flange mounting bolt holes such that the conduit entries are oriented to suit the field conduit runs 5 Screw in the six mounting bolts and tighten 6 If a full pipe coupling fitting is to be used instead of the mounting flange then the lower shaft assem bly must be assembled from the inside of the bin after the paddle housing is secured to the bin wall Note S...

Страница 8: ...echanical movement of the motor bracket resulting in a failed device 5 The instrument is grounded by attaching a 14AWG ground wire to the switch ground screw located on the rear of the switch bracket as shown in Figure 4 6 The ground wire should be terminated by a forked terminal connector for easier installation 7 The ground screw is loosened a couple of turns until the fork of the terminal conne...

Страница 9: ...CIRCUIT CONTROL TO TO SPDT 1 CLOSED COMMON OPEN CLOSED OPEN COMMON SPDT 2 PADDLE RESTRICTED OR STOPPED PADDLE FREE TURNING SPDT 2 COMMON OPEN CLOSED OPEN COMMON CLOSED SPDT 1 FIGURE 6 FIGURE 5 WIRING DENOTES FIELD SPDT SWITCHES CONTROL CIRCUIT COMMON OPEN CLOSED CLOSED OPEN COMMON 12 Figure 8 indicates the recommended field wiring paths inside the housing to ensure proper switch operation and to e...

Страница 10: ... NOTES INTERNAL WIRING PATHS SHOULD BE RUN AS SHOWN FAILURE TO DO SO CAN RESULT IN RESTRICTED SWITCH ACTUATION DO NOT RUN WIRING WITH EXTRA LENGTHS SWITCH ASSEMBLY DO NOT STUFF EXTRA WIRING AGAINST MANUALLY EXERCISE MOTOR BRACKET ROTATION TO ENSURE FREE UNRESTRICTED HAVE BEEN MADE MOTION AFTER WIRING CONNECTIONS Figure 8 ...

Страница 11: ...and the switches close B Maintenance Requirements The operation of the paddle switch is simple and it should operate without problems for an indefinite amount of time Routine maintenance requirements of the switch are minimal Periodic checks of the shaft alignment and free rotation within the housing should be performed The interior of the housing should be checked periodically to ensure there is ...

Страница 12: ...nscrew the housing cover to expose the interior switch assembly 4 With power disconnected disconnect all field wiring from both the power terminal strip and to the switch contact terminals Disconnect the field ground wire connection 5 Remove the unit from service and perform the remaining steps in a clean work area or bench setting It is strongly recommended not to attempt repairs on the unit whil...

Страница 13: ...sembly directly over the main power shaft using the lower bracket guide posts as centering guides Lightly maneuver the switch assembly until the motor clevis is mated with the main shaft tang When this occurs the assembly should sit flush on the bottom hous ing mounting holes and posts The assembly should be stable in a flat position with respect to the housing A physical check can be performed to...

Страница 14: ...hes when the paddle is rotated and returns to its normal position when the paddle motion is removed then the wiring connec tions can be made If not repeat steps 4 6 7 Terminate the power wiring to the main power terminal block and connect the ground wire to the grounding screw 8 Re install the paddle switch to its intended final location Re connect the wiring connections to the switches as require...

Страница 15: ...CH AS 1 x3 SINGLE BLADE PADDLE SIDE BIN MOUNT SAND GRAVEL ETC WEIGHING 65 lbs cu ft PREFERRED USE WITH MATERIALS SIDE BIN MOUNT 1 1 2 x5 4 BLADE PADDLE MOST COMMONLY USED WHERE SHORT SHAFT IS WEIGHING 25 65 lbs cu ft WEIGHING 10 25 lbs cu ft MOST COMMONLY USED WHERE SHORT SHAFT IS 2 x7 4 BLADE PADDLE SIDE BIN MOUNT PREFERRED USE WITH MATERIALS FOR HIGH INTERMEDIATE AND LOW LEVEL INDICATION PREFERR...

Страница 16: ...s applications or servicing of the product K TEK s warranty does not include onsite repair or services Field service rates can be supplied on request If a product is believed to be defective the original purchaser shall notify K TEK and request a Returned Material Authorization before returning the material to K TEK with transportation prepaid by the purchaser Request door to door delivery via New...

Страница 17: ...KP 0200 1 Rev f 10 2010 DCN0536 17 ...

Страница 18: ...KP 0200 1 Rev f 10 2010 DCN0536 18 ...

Страница 19: ...KP 0200 1 Rev f 10 2010 DCN0536 19 ...

Страница 20: ...KP 0200 1 Rev f 10 2010 DCN0536 20 ...

Отзывы: