18
Getting
Started
Leading
EDGE COMPUTING
2.7 Power On/Off Sequence
To power-on the PCIe to PXIe Extension Kit:
1. Ensure that the extension cable is properly connected to
the host PC and PXIe chassis.
2. In a single chassis configuraiton, power on the PXIe
chassis. In a multiple chassis configuration, power on
the most subordinate chassis in the configuration first,
then power on the uplink chassis. Continue until all chas-
sis are powered on.
3. When the status LEDs of the PXI Express chassis and all
installed modules indicate ready, power on the host PC.
As the PCIe to PXIe Extension Kit is equipped with a standard
PCIe switch, the BIOS will identify each device behind the switch
and assign resources to each during startup. Thus the PXI
Express chassis must be powered up in order to acquire appropri-
ate resources from the BIOS.
To power down the PCIe to PXIe Extension Kit:
1. Power down the host PC.
2. Power down the PXIe chassis.
CAUTION:
DO NOT
remove the cable after the system and PXIe
chassis are powered on. Disconnecting the cable while
the system is running may cause unpredictable system
errors and/or a system crash.
CAUTION:
DO NOT
power down the PXIe chassis until the host PC
is powered off. If the PXIe chassis is powered off while
the host PC is on, the host PC may hang or crash.
Содержание PCIe-68638 Series
Страница 1: ...Manual Rev 2 1 Revision Date Dec 19 2020 PCIe PXIe 68638 Series JYTEK PXIe Extension Kit User s Manual...
Страница 8: ...viii List of Figures Leading EDGE COMPUTING This page intentionally left blank...
Страница 10: ...x List of Tables Leading EDGE COMPUTING This page intentionally left blank...
Страница 16: ...6 Introduction Leading EDGE COMPUTING This page intentionally left blank...
Страница 32: ...22 Hardware Information Leading EDGE COMPUTING This page intentionally left blank...
Страница 36: ...26 Leading EDGE COMPUTING This page intentionally left blank...