![Jydepejsen Athene Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/jydepejsen/athene/athene_installation-and-user-manual_2037159004.webp)
Note: A heat shield or protective wall may be used to reduce clearances if approved by the regulatory
authority. Clearances to noncombustible materials are 2" (5 cm), but note that “noncombustible” must
be solid cement or block (not brick or tile over combustible material).
2. Before installing your stove
Jydepejsen stoves Tre2+3, Troja 1+2+3, Softline, Fineline, Zeus, Athene,
Cubic,
Hera and Avanti are tested by OMNI-Test Laboratories, Inc. of Portland, Oregon and
are listed to UL 1482 and ULC S627. They are also EPA certified and meet the more
stringent WA State Environmental standards.
Consult your local Building Inspector or Fire Marshall before installation to determine
the need to obtain a permit. Also inquire about local codes and installation inspection
requirements in your area.
If the stove is not installed properly, a home fire may result. To reduce the risk of fire,
follow the installation instructions. Contact local building or fire officials about restric
-
tions and installation inspection requirements in your area.
Not for use in a mobile home.
A floor plate of non-combustible material (tempered glass floor plates are accept
-
able) must cover under the stove and extend 16" (41 cm) (18" (45 cm) in Canada)
in front of the stove door, 8" (20 cm) beyond the sides of the fuel-loading door, and
under the pipe and 2" (5 cm) beyond each side for back venting. In Canada, the 8"
(20 cm) floor protection is required beyond the sides of the stove and in the back of
the stove (0" in the back for the US).
Wall and corner models - If you have a Cubic Wall/Cubic Corner/Cubic W200 the
stove must be installed with the enclosed framing and should meet the NFPA211
guidelines. The installation must not weaken the chimney construction. Anchoring
must be done in consultation with your dealer.
Cubic 166/215 -
The taller models may reach the ceiling (or less than the 18" clear
-
ance to the connector pipe). If the unit does not meet the proper clearance to the
ceiling, then chimney must be used to connect to the stove collar with the adapter
supplied by the chimney manufacturer.
4
Description
Trendline 1-2-3 /Troja 1-2-3 / Softline / Zeus / Athene
Hera / Avanti/Fineline 1-2/Cubic series
A.
DISTANCE TO SIDE WALL
US/CANADA 18" (46 cm)
B.
DISTANCE TO BACK WALL
US/CANADA 10"
(25 cm)
C.
CORNER DISTANCE TO SIDE WALLS
US/CANADA 7"
(18 cm)
D.
CONNECTOR PIPE TO SIDE WALL
US/CANADA 26"
(65 cm)
E.
CONNECTOR PIPE TO BACK WALL
US/CANADA 16"
(41 cm)
F.
CORNER PIPE TO SIDE WALLS
US/CANADA 16"
(41 cm)
G.
DISTANCE TO FURNITURE
US/CANADA 36" (92 cm)
H.
FRONT FLOOR PROTECTION
US
16"
(41 cm)
CANADA 18"
(46 cm)
I.
SIDE FLOOR PROTECTION
US
8"
(20 cm)
beyond the sides of the fuel loading door
CANADA 8"
(20 cm)
beyond the sides of the stove
J.
DISTANCE TO WALL (TURNAbLE)
US/CANADA 40" (100 cm)
K.
CONNECTOR PIPE TO WALL (TURNAbLE) US/CANADA 48" (120 cm)
L.
DISTANCE TO FLOOR
US/CANADA 20" (50 cm)
CEILING TO TOP OF STOVE
US/CANADA 36"
(92 cm)
CEILING TO CONNECTOR PIPE
US/CANADA 18"
(46 cm)
MINIMUM CLEARANCES TO COMBUSTIBLES -
Refer to diagrams on next 2 pages
Содержание Athene
Страница 6: ...6 CUBIC 109 166 215 DIAGRAMS FOR CUBIC SERIES CUBIC WALL CUBIC CORNER CUBIC WALL CUBIC CORNER...
Страница 10: ...10...
Страница 24: ...1 2 3 Trendline soapstone convection 24...
Страница 25: ...Trendline with full soapstone cladding Soapstone assembling 6 4 5 2 1 3 6 25...
Страница 26: ...Softline with full soapstone or ceramic cladding Soapstone assembling 1 5 cm 1 2 3 7 6 5 4 26...
Страница 27: ...Softline with full soapstone or ceramic cladding Ceramic assembling 1 2 3 4 5 6 7 27...