(No.86700)2-27
2.2.4 CHECKUP AND ADJUSTMENT OF MECHANISM PHASE
NOTE:
Pay careful attention to the installing order and phase of mechanism parts of the loading system.
Fig.2-2-5 Top of main deck
Fig.2-2-6 Rotary encoder
[37] LOADING RING ASSEMBLY
[33] LINK LEVER
[33] LINK LEVER/CONTROLL CAM
ASSEMBLY to those of MAIN DECK.
[35] LOADING GEAR(T) ASSEMBLY
(T) ASSEMBLY to that of the MAIN
DECK hole.
[9] WEEL GEAR
WHEEL GEAR to MAIN DECK hole.
Align the hole of the
LINK LEVER to MAIN
DECK hole.
Align each one LINK LEVER
assembly hole and MAIN DECK hole
to the hole at the CONTROL CAM
position.
MAIN DECK
Align the two holes of the LOADING RING
Align the hole of the LOADING GEAR
Align one of the three holes of
Align this part to each
“Triangle” mark.
Align this part to each
CASS SW
REC SAFTY SW
S-CASS SW
“Triangle” mark.
Содержание GR-D30EK
Страница 54: ...2 43 2 44 1 2 3 4 A B C PREMDA CIRCUIT BOARD 05 PREMDA YB 10405 01 01 FOIL SIDE B ...
Страница 130: ...2 43 2 44 1 2 3 4 A B C PREMDA CIRCUIT BOARD 05 PREMDA YB 10405 01 01 FOIL SIDE B ...
Страница 224: ...2 43 2 44 1 2 3 4 A B C PREMDA CIRCUIT BOARD 05 PREMDA YB 10405 01 01 FOIL SIDE B ...