background image

¡Atención! Existe peligro de explosión si la batería se reemplaza de manera incorrecta.
Reemplazar la baterían EXclusivamente con el mismo tipo o el equivalente
recomendado por el fabricante. Desechar las baterías gastadas según las instrucciones
del fabricante.

Varning! Explosionsfara vid felaktigt batteribyte. Ersätt endast batteriet med samma
batterityp som rekommenderas av tillverkaren eller motsvarande. Följ tillverkarens
anvisningar vid kassering av använda batterier.

Jewelry Removal Warning

WARNING: Before working on equipment that is connected to power lines, remove
jewelry, including rings, necklaces, and watches. Metal objects heat up when connected
to power and ground and can cause serious burns or can be welded to the terminals.
Waarschuwing Alvorens aan apparatuur te werken die met elektrische leidingen is
verbonden, sieraden (inclusief ringen, kettingen en horloges) verwijderen. Metalen
voorwerpen worden warm wanneer ze met stroom en aarde zijn verbonden, en kunnen
ernstige brandwonden veroorzaken of het metalen voorwerp aan de aansluitklemmen
lassen.

Varoitus Ennen kuin työskentelet voimavirtajohtoihin kytkettyjen laitteiden parissa, ota
pois kaikki korut (sormukset, kaulakorut ja kellot mukaan lukien). Metalliesineet
kuumenevat, kun ne ovat yhteydessä sähkövirran ja maan kanssa, ja ne voivat aiheuttaa
vakavia palovammoja tai hitsata metalliesineet kiinni liitäntänapoihin.

Avertissement Avant d'accéder à cet équipement connecté aux lignes électriques, ôter
tout bijou (anneaux, colliers et montres compris). Lorsqu'ils sont branchés à
l'alimentation et reliés à la terre, les objets métalliques chauffent, ce qui peut provoquer
des blessures graves ou souder l'objet métallique aux bornes.

Warnung Vor der Arbeit an Geräten, die an das Netz angeschlossen sind, jeglichen
Schmuck (einschließlich Ringe, Ketten und Uhren) abnehmen. Metallgegenstände
erhitzen sich, wenn sie an das Netz und die Erde angeschlossen werden, und können
schwere Verbrennungen verursachen oder an die Anschlußklemmen angeschweißt
werden.

Avvertenza Prima di intervenire su apparecchiature collegate alle linee di alimentazione,
togliersi qualsiasi monile (inclusi anelli, collane, braccialetti ed orologi). Gli oggetti

69

Содержание SSR1200

Страница 1: ...SSR1200 Appliance Hardware Guide Published 2022 08 30 ...

Страница 2: ... Guide Copyright 2022 Juniper Networks Inc All rights reserved The information in this document is current as of the date on the title page YEAR 2000 NOTICE Juniper Networks hardware and software products are Year 2000 compliant Junos OS has no known time related limitations through the year 2038 However the NTP application is known to have some difficulty in the year 2036 END USER LICENSE AGREEME...

Страница 3: ...aration Checklist for SSR1200 15 SSR1200 Site Guidelines and Requirements 16 General Site Installation Guidelines 17 Site Electrical Wiring Guidelines 17 Environmental Requirements and Specifications for SSR1200 19 Clearance Requirements for Hardware Maintenance of SSR1200 19 Rack Requirements for SSR1200 20 Cable Specifications and Pinouts for SSR1200 23 Transceiver Support for SSR1200 23 3 Initi...

Страница 4: ...wer Supply on the SSR1200 45 Removing the AC Power Supply from an SSR1200 46 Installing the AC Power Supply in an SSR1200 46 Unmount the SSR1200 Chassis 47 Remove the SSR1200 from a Rack 47 5 Contacting Customer Support and Returning the Chassis or Components Contacting Customer Support and Returning the Chassis or Components 50 How to Return a Hardware Component to Juniper Networks Inc 50 Locate ...

Страница 5: ...Guidelines and Warnings 63 Chassis and Component Lifting Guidelines 66 Radiation from Open Port Apertures Warning 66 Maintenance and Operational Safety Guidelines and Warnings 67 Action to Take After an Electrical Accident 73 General Electrical Safety Guidelines and Warnings 73 SSR1200 Agency Approvals 75 FCC Declarations 77 Lithium Battery Declaration 78 v ...

Страница 6: ...configuration routine maintenance and troubleshooting for the SSR1200 appliance After completing the installation and basic configuration procedures covered in this guide refer to the Session Smart Router software documentation for information about further software configuration vi ...

Страница 7: ...1 CHAPTER Overview SSR1200 Appliance Overview 2 SSR1200 Chassis 3 ...

Страница 8: ...l session traffic Applications devices or users cannot initiate any session that does not comply with the authentication policies and access rules The SSR1200 supports Layer 2 through Layer 5 stateful firewall functions including DoS DDoS protection NAT encryption VPN and traffic filtering Adaptive encryption The SSR1200 automatically detects traffic encrypted using HTTPS or IPsec and does not re ...

Страница 9: ...appliance function Hot pluggable You can remove and replace these components without powering off the appliance but the appliance function is interrupted until you replace the component The FRUs in SSR1200 appliances are Power supplies hot insertable and hot removable Transceivers hot pluggable SSR1200 Chassis IN THIS SECTION Front Panel of an SSR1200 4 Rear Panel of an SSR1200 4 Chassis Physical ...

Страница 10: ... 1 Chassis LEDs 6 1 10 GbE SFP ports 1 0 through 1 3 2 LCD screen 7 1 GbE Ethernet ports 0 0 through 0 6 3 RESET button 8 Console port 4 USB 3 0 ports 9 Claim code 5 1 GbE management port for Mist operations 10 Navigation buttons for LCD screen reserved for future use Rear Panel of an SSR1200 Figure 2 on page 4 shows the rear panel of an SSR1200 Figure 2 Rear Panel Components of SSR1200 1 Earth gr...

Страница 11: ...he physical specifications of SSR1200 Table 1 Physical Specifications of SSR1200 Model Height Width Depth Weight SSR1200 44 mm 438 mm 431 mm 16 5 kg 36 38 lbs Chassis Status LEDs Figure 3 on page 5 shows the chassis status LEDs on the front panel and Table 2 on page 6 describes the LEDs Figure 3 SSR1200 Chassis Status LEDs 5 ...

Страница 12: ...is powered on Off The appliance is powered off 2 Status Solid green The appliance is operating normally Solid red Indicates a major alarm such as a hardware component failure Off The appliance is not receiving power 3 SSD Blinking amber Indicates SSD activity Off The SSD is not being accessed 6 ...

Страница 13: ...ure 4 Network Port LEDs on an SSR1200 Table 3 Port LEDs on the Ethernet Ports Callout LED Description 1 Link Activity LED on the left Blinking amber Link is established and there is activity on the port Solid amber Link is established but there is no activity on the port Off There is no link established 2 Speed LED on the right Solid amber The link is operating at 1 Gbps speed Solid green The link...

Страница 14: ...n The link is operating at 10 Gbps speed Off The link is operating at 1 Gbps speed Cooling System The cooling system of the SSR1200 consists of two fixed fans The fan controller on the appliance monitors the temperature of the chassis and adjusts the fan speed according to the temperature The SSR1200 appliances have front to back airflow The air is pulled in through the front of the chassis toward...

Страница 15: ...tem IN THIS SECTION AC Power Cord Specifications for SSR1200 10 The SSR1200 appliance ships with two AC power supply units 1 1 redundancy preinstalled Each power supply unit is a hot removable and hot insertable field replaceable unit FRU when the second 9 ...

Страница 16: ...rent Rating Maximum Power Consumption Power Supply Type SSR1200 100 240 VAC 50 60 Hz 3 5 A 300 W External hot swappable AC Power Cord Specifications for SSR1200 We ship detachable region specific AC power cords with the chassis The coupler is type C15 as described by International Electrotechnical Commission IEC standard 60320 The plug end of the power cord fits into the power source outlet that i...

Страница 17: ...U Brazil 250 VAC 10 A 50 Hz NBR 14136 Type BR 3 CBL EX PWR C13 BR No graphic available China 250 VAC 10 A 50 Hz GB 1002 1996 Type PRC 3 CBL EX PWR C13 CH Europe except Italy Switzerland and United Kingdom 250 VAC 10 A 50 Hz CEE 7 VII Type VIIG CBL EX PWR C13 EU India 250 VAC 10 A 50 Hz IS 1293 Type IND 3 CBL EX PWR C13 IN No graphic available Israel 250 VAC 10 A 50 Hz SI 32 1971 Type IL 3G CBL EX ...

Страница 18: ...250 VAC 10 A 50 Hz CEI 23 16 Type I 3G CBL EX PWR C13 IT Japan 125 VAC 12 A 50 Hz or 60 Hz SS 00259 Type VCTF CBL EX PWR C13 JP Korea 250 VAC 10 A 50 Hz or 60 Hz CEE 7 VII Type VIIGK CBL EX PWR C13 KR North America 125 VAC 13 A 60 Hz NEMA 5 15 Type N5 15 CBL EX PWR C13 US South Africa 250 VAC 10 A 50 Hz SABS 164 1 1992 Type ZA 3 CBL EX PWR C13 SA 12 ...

Страница 19: ...ued Country Region Electrical Specifications Plug Standards Juniper Model Number Graphic Switzerland 250 VAC 10 A 50 Hz SEV 6534 2 Type 12G CBL EX PWR C13 SZ No graphic available United Kingdom 250 VAC 10 A 50 Hz BS 1363 A Type BS89 13 CBL EX PWR C13 UK 13 ...

Страница 20: ...2 CHAPTER Site Planning Preparation and Specifications Site Preparation Checklist for SSR1200 15 SSR1200 Site Guidelines and Requirements 16 Cable Specifications and Pinouts for SSR1200 23 ...

Страница 21: ...t environmental factors such as temperature and humidity do not exceed device tolerances Environmental Requirements and Specifications for SSR1200 on page 19 Power Measure the distance between the external power sources and the device installation site Locate sites for connection of system grounding Calculate the power consumption and requirements Rack Requirements Verify that your rack meets the ...

Страница 22: ... Cables Acquire cables and connectors Review the maximum distance allowed for each cable Choose the length of the cable based on the distance between the hardware components being connected Plan the cable routing and management SSR1200 Site Guidelines and Requirements IN THIS SECTION General Site Installation Guidelines 17 Site Electrical Wiring Guidelines 17 Environmental Requirements and Specifi...

Страница 23: ... appliance Follow the ESD procedures to avoid damaging equipment Static discharge can cause components to fail completely or intermittently over time Install the appliance in a secure area so that only authorized personnel can access the appliance Site Electrical Wiring Guidelines Table 8 on page 18 describes the factors you must consider while planning the electrical wiring at your site WARNING Y...

Страница 24: ...ce To reduce or eliminate RFI from your site wiring do the following Use a twisted pair cable with a good distribution of grounding conductors If you must exceed the recommended distances use a high quality twisted pair cable with one ground conductor for each data signal when applicable Electromagnetic compatibility If your site is susceptible to problems with electromagnetic compatibility EMC pa...

Страница 25: ... 158 F Clearance Requirements for Hardware Maintenance of SSR1200 When planning the site for installing an SSR1200 you must allow sufficient clearance around the installed chassis For the operating temperature of the SSR1200 to be optimal the airflow around the chassis must be unrestricted See Cooling System on page 8 for more information about the airflow through the chassis For service personnel...

Страница 26: ...nts for SSR1200 You can mount the SSR1200 on four post racks The rack mounting kit is shipped with the appliance You can order a spare rack mounting kit part number SSR1200 RMK separately if required Table 10 on page 21 provides the rack requirements and specifications for SSR1200 20 ...

Страница 27: ...e and strength requirements to support the weight A U is the standard rack unit defined in Cabinets Racks Panels and Associated Equipment document number EIA 310 D published by the Electronics Industry Association Mounting bracket hole spacing Ensure that the holes in the mounting brackets are spaced at 1 U 1 75 in or 4 45 cm so that the device can be mounted in any rack that provides holes that a...

Страница 28: ...n the rails in a rack that complies with this standard is usually wider than the device s mounting brackets which measure 19 in 48 26 cm from outer edge to outer edge Use approved wing devices to narrow the opening between the rails as required Ensure that the rack rails are spaced widely enough to accommodate the external dimensions of the device chassis The outer edges of the front mounting brac...

Страница 29: ...evice by using the Hardware Compatibility Tool The tool also documents the optical and cable characteristics where applicable for each transceiver You can search for transceivers by product and the tool displays all the transceivers supported on that device or by category interface speed or type The list of supported transceivers for the SSR1200 is located at https apps juniper net hct product CAU...

Страница 30: ...APTER Initial Installation and Configuration Unpack and Mount an SSR1200 25 Connect SSR1200 to Power 30 Connect SSR1200 to External Devices 34 Onboarding an SSR Conductor Managed SSR1200 onto Mist Cloud 35 ...

Страница 31: ... number 2 A box cutter or packing knife to slice open the tape that seals the boxes Unpack an SSR1200 The SSR1200 is shipped in a cardboard carton and secured with foam packing material NOTE The SSR1200 is maximally protected inside the cardboard carton Do not unpack it until you are ready to begin installation To unpack the SSR1200 1 Move the cardboard carton to a staging area as close to the ins...

Страница 32: ...s shipped depend on the configuration you order If any part on the packing list is missing contact your customer service representative or contact Juniper customer care from within the U S or Canada by telephone at 1 888 314 5822 For international dial or direct dial options in countries without toll free numbers see https www juniper net support requesting support html Table 11 Parts List for a F...

Страница 33: ...st rack or a cabinet Complete these prerequisites before you install the appliance Prepare the site for installation as described in Site Preparation Checklist for SSR1200 on page 15 Be sure the site has adequate clearance for both airflow and hardware maintenance as described in SSR1200 Site Guidelines and Requirements on page 16 Unpack the appliance as described in Unpack an SSR1200 on page 25 E...

Страница 34: ...SSR1200 on a four post rack 1 Review the General Safety Guidelines and Warnings 2 Wrap and fasten one end of the electrostatic discharge ESD cable grounding strap around your bare wrist and connect the other end to a site ESD point 3 Remove the SSR1200 from the shipping carton see Unpack an SSR1200 on page 25 4 Attach the front mounting brackets to the front of the chassis using the six flat head ...

Страница 35: ...ke sure to tighten the screws in the two bottom holes first and then tighten the screws in the two top holes next Figure 8 Install the SSR1200 Appliance in a Four Post Rack 7 Continue to support the SSR1200 in place and have the second person slide the rear mounting blades into the channels of the side mounting rails 8 Secure the rear mounting blades to the rack post using rack mounting screws on ...

Страница 36: ...onal injury IN THIS SECTION Connect Earth Ground to SSR1200 30 Connect Power to SSR1200 32 Power Off the SSR1200 33 NOTE To meet safety and electromagnetic interference EMI requirements and to ensure proper operation you must connect the SSR1200 appliance to an earth ground before you connect it to power Connect Earth Ground to SSR1200 To meet safety and electromagnetic interference EMI requiremen...

Страница 37: ...ance To ground the appliance 1 Wrap and fasten one end of the ESD grounding strap around your wrist and connect the other end to a site ESD point For more details see Prevention of Electrostatic Discharge Damage 2 Ensure that all grounding surfaces are clean and brought to a bright finish before grounding connections are made 3 Connect the grounding cable to a proper earth ground such as the rack ...

Страница 38: ...and to ensure proper operation you must connect the chassis to an earth ground before you connect it to power For installations that require a separate grounding conductor to the chassis use the protective earthing terminal on the appliance chassis to connect to the earth ground The appliance gains additional grounding when you plug the PSU in the appliance to a grounded AC power outlet by using t...

Страница 39: ...at Step 4 and Step 5 to insert the second power cord 7 If the AC power source outlet has a power switch set it to the off O position 8 Insert the power cord plug into an AC power source outlet 9 If the AC power source outlet has a power switch set it to the on position 10 Set the power switch on the appliance to the on position Power Off the SSR1200 You can power off the SSR1200 in one of the foll...

Страница 40: ...g the power cord or switch off the power source After powering off a power supply wait at least 10 seconds before turning it back on After powering on a power supply wait at least 10 seconds before turning it off Connect SSR1200 to External Devices IN THIS SECTION Connect SSR1200 to a Management Console 34 SSR1200 has a console port and a management port You can configure and manage the SSR1200 ap...

Страница 41: ...ole Server Figure 14 Connecting the SSR1200 Directly to a Management Console Onboarding an SSR Conductor Managed SSR1200 onto Mist Cloud IN THIS SECTION Pre Onboarding Verification 36 Onboarding a Conductor Managed SSR1200 Through the Mist Portal 39 Assign SSR1200 to a Site 41 SSR1200 comes pre installed with the Session Smart Router software version 5 4 4 The appliance includes a QR code that whe...

Страница 42: ...or managed appliance the process is simplified by ensuring that the IP address of the managing conductor is configured for the site that will adopt the appliance This is typically done during Site Configuration To verify the conductor IP address has been assigned 1 Select Site Configuration from the Organization menu 2 Select the Site the appliance will be adopted into from the list of Sites 3 Scr...

Страница 43: ...is present copy the IP address from the SSR GUI a On the Configuration Home panel in the SSR GUI click Authority b Under Authority Settings scroll down to Conductor Addresses and copy the IP address of the conductor 37 ...

Страница 44: ...4 Return to the Mist Site Configuration scroll down to the Session Smart Conductor and add the conductor IP address 38 ...

Страница 45: ...following process to onboard a conductor managed SSR appliance into the Mist cloud using the Mist UI and your claim code 1 Unbox the SSR1200 appliance 2 Connect to the WAN port The port 0 0 on the front panel of the SSR1200 appliance is the WAN 1 network interface port 39 ...

Страница 46: ...lowing picture the claim code is K6TAACRTCJWQ8GQ 5 Login to the Mist UI on another device and navigate to your organization 6 Go to the WAN Edges page and click Claim WAN Edges 7 Enter the claim code NOTE Under Manage Configuration do not check Manage Configuration with Mist if your SSR1200 is running the SSR software version 5 4 4 40 ...

Страница 47: ...iguration After a few minutes the SSR1200 appears in the Inventory with the status as Unassigned Once it appears in the inventory it must be assigned to a site Assign the SSR1200 appliance to a site to complete the SSR onboarding See Assign SSR1200 to a Site on page 41 Assign SSR1200 to a Site After the SSR has been onboarded to the Mist Cloud assign it to a site to begin managing the appliance co...

Страница 48: ...n list select Assign to Site 2 Select the site from the Site list Under Manage Configuration do not check Manage Configuration with Mist for the SSR Conductor managed appliance This allows the device to reach out to the conductor IP address specified when the site was created to receive configuration information 42 ...

Страница 49: ...uration with Mist If Manage Configuration with Mist is not selected the appliance will not be managed by Mist 3 Click Assign to Site The site assignment will take a few minutes After the site is fully onboarded use the Mist WAN Edge Device View to access the appliance and the Insights view to view events and activity 43 ...

Страница 50: ...4 CHAPTER Maintaining Components Maintaining the SSR1200 Hardware Components 45 SSR1200 Power Supply Maintenance 45 Unmount the SSR1200 Chassis 47 ...

Страница 51: ...ng the Chassis or Components on page 50 SSR1200 Power Supply Maintenance SUMMARY Maintaining an SSR1200 appliance includes replacing power supplies Replacing includes removing a failed power supply and installing a functional power supply IN THIS SECTION Replacing an AC Power Supply on the SSR1200 45 Replacing an AC Power Supply on the SSR1200 IN THIS SECTION Removing the AC Power Supply from an S...

Страница 52: ...he power cord retainer up and remove the power cord from the power supply faceplate 5 Slide the ejector lever towards the right see Figure 15 on page 46 until the power supply is unseated 6 Grasp the power supply handle and pull firmly to slide the power supply halfway out of the chassis 7 Place one hand under the power supply to support it and slide it completely out of the chassis Take care not ...

Страница 53: ... until it is fully seated and the ejector lever fits into place You will hear a distinct click when the power supply is fully seated in the chassis Figure 16 Installing an AC Power Supply 5 Connect the power cord see Connect SSR1200 to Power on page 30 Unmount the SSR1200 Chassis IN THIS SECTION Remove the SSR1200 from a Rack 47 Remove the SSR1200 from a Rack Before removing an SSR1200 from a rack...

Страница 54: ...ords Ensure that you have disconnected any cables or wires attached to the SSR1200 To remove an SSR1200 from a rack 1 Have one person support the weight of the appliance while another person uses the screwdriver to remove the screws that attach the front mounting brackets to the rack 2 Remove the SSR1200 from the rack 3 Use the screwdriver to remove the screws that attach the rear mounting blades ...

Страница 55: ...5 CHAPTER Contacting Customer Support and Returning the Chassis or Components Contacting Customer Support and Returning the Chassis or Components 50 ...

Страница 56: ...rn a Hardware Component to Juniper Networks Inc If a hardware component fails please contact Juniper Networks Inc to obtain a Return Material Authorization RMA number This number is used to track the returned material at the factory and to return repaired or new components to you as needed NOTE Do not return any component to Juniper Networks Inc unless you have first obtained an RMA number Juniper...

Страница 57: ...ber and serial number of the defective component 2 Obtain an RMA number from the JTAC You can send e mail or contact JTAC by telephone as described above 3 Provide the following information in your e mail message or during the telephone call Part number and serial number of component Your name organization name telephone number and fax number Description of the failure 4 The support representative...

Страница 58: ... JTAC After locating the serial number of the device or component you want to return open a service request with JTAC on the Web or by telephone Before you request an RMA from JTAC be prepared to provide the following information Your existing service request number if you have one Serial number of the component Your name organization name telephone number fax number and shipping address Details o...

Страница 59: ...r for return of the component Guidelines for Packing and Shipping Hardware Components To pack and ship individual components 1 When you return the chassis or components make sure that they are adequately protected with packing materials and packed so that the pieces are prevented from moving around inside the carton 2 Use the original shipping materials if they are available 3 Place individual com...

Страница 60: ...arge Damage 60 Fire Safety Requirements 61 Laser and LED Safety Guidelines and Warnings 63 Chassis and Component Lifting Guidelines 66 Radiation from Open Port Apertures Warning 66 Maintenance and Operational Safety Guidelines and Warnings 67 Action to Take After an Electrical Accident 73 General Electrical Safety Guidelines and Warnings 73 SSR1200 Agency Approvals 75 FCC Declarations 77 Lithium B...

Страница 61: ...ndard practices for preventing accidents Waarschuwing Dit waarschuwingssymbool betekent gevaar U verkeert in een situatie die lichamelijk letsel kan veroorzaken Voordat u aan enige apparatuur gaat werken dient u zich bewust te zijn van de bij elektrische schakelingen betrokken risico s en dient u op de hoogte te zijn van standaard maatregelen om ongelukken te voorkomen Varoitus Tämä varoitusmerkki...

Страница 62: ...ímbolo de aviso significa peligro Existe riesgo para su integridad física Antes de manipular cualquier equipo considerar los riesgos que entraña la corriente eléctrica y familiarizarse con los procedimientos estándar de prevención de accidentes Varning Denna varningssymbol signalerar fara Du befinner dig i en situation som kan leda till personskada Innan du utför arbete på någon utrustning måste d...

Страница 63: ...tructions are provided in the hardware documentation for this device Such an action could cause severe electrical shock Do not push or force any objects through any opening in the chassis frame Such an action could result in electrical shock or fire Avoid spilling liquid onto the chassis or onto any device component Such an action could cause electrical shock or damage the device Avoid touching un...

Страница 64: ...es auxquelles seul le personnel de service peut accéder en utilisant un outil spécial un mécanisme de verrouillage et une clé ou tout autre moyen de sécurité L accès aux zones de sécurité est sous le contrôle de l autorité responsable de l emplacement Warnung Diese Einheit ist zur Installation in Bereichen mit beschränktem Zutritt vorgesehen Ein Bereich mit beschränktem Zutritt ist ein Bereich zu ...

Страница 65: ...nordning och kontrolleras av den auktoritet som ansvarar för området Qualified Personnel Warning WARNING Only trained and qualified personnel should install or replace the device Waarschuwing Installatie en reparaties mogen uitsluitend door getraind en bevoegd personeel uitgevoerd worden Varoitus Ainoastaan koulutettu ja pätevä henkilökunta saa asentaa tai vaihtaa tämän laitteen Avertissement Tout...

Страница 66: ...d make sure that it is in direct contact with your skin If a grounding strap is not available hold the component in its antistatic bag see Figure 18 on page 61 in one hand and touch the exposed bare metal of the device with the other hand immediately before inserting the component into the device WARNING For safety periodically check the resistance value of the ESD grounding strap The measurement ...

Страница 67: ...istatic Bag CAUTION ANSI TIA EIA 568 cables such as Category 5e and Category 6 can get electrostatically charged To dissipate this charge always ground the cables to a suitable and safe earth ground before connecting them to the system Attention Les câbles ANSI TIA EIA 568 par exemple Cat 5e et Cat 6 peuvent emmagasiner des charges électrostatiques Pour évacuer ces charges reliez toujours les câbl...

Страница 68: ...which uses noncorrosive fire retardants to extinguish the fire Fire Suppression Equipment Type C fire extinguishers which use noncorrosive fire retardants such as carbon dioxide and Halotron are most effective for suppressing electrical fires Type C fire extinguishers displace oxygen from the point of combustion to eliminate the fire For extinguishing fire on or around equipment that draws air fro...

Страница 69: ...ct Warning 64 Class 1 LED Product Warning 64 Laser Beam Warning 65 Juniper Networks devices are equipped with laser transmitters which are considered a Class 1 Laser Product by the U S Food and Drug Administration and are evaluated as a Class 1 Laser Product per EN 60825 1 requirements Observe the following guidelines and warnings General Laser Safety Guidelines When working around ports that supp...

Страница 70: ...e du laser sur la rétine toute focalisation directe de l œil sur une source laser même de faible puissance peut entraîner des lésions oculaires irréversibles Class 1 Laser Product Warning LASER WARNING Class 1 laser product Waarschuwing Klasse 1 laser produkt Varoitus Luokan 1 lasertuote Avertissement Produit laser de classe I Warnung Laserprodukt der Klasse 1 Avvertenza Prodotto laser di Classe 1...

Страница 71: ...s bekijken met optische instrumenten Varoitus Älä katso säteeseen äläkä tarkastele sitä suoraan optisen laitteen avulla Avertissement Ne pas fixer le faisceau des yeux ni l observer directement à l aide d instruments optiques Warnung Nicht direkt in den Strahl blicken und ihn nicht direkt mit optischen Geräten prüfen Avvertenza Non fissare il raggio con gli occhi né usare strumenti ottici per osse...

Страница 72: ... 7 lb 18 kg to 70 5 lb 32 kg Two or more people 70 5 lb 32 kg to 121 2 lb 55 kg Three or more people Above 121 2 lb 55 kg Use material handling systems such as levers slings lifts and so on When this is not practical engage specially trained persons or systems such as riggers or movers Radiation from Open Port Apertures Warning LASER WARNING Because invisible radiation might be emitted from the ap...

Страница 73: ...stråling kan emiteres fra portens åpning når det ikke er tilkoblet en fiberkabel Aviso Dada a possibilidade de emissão de radiação invisível através do orifício da via de acesso quando esta não tiver nenhum cabo de fibra conectado deverá evitar an EXposição à radiação e não deverá olhar fixamente para orifícios que se encontrarem a descoberto Atención Debido a que la apertura del puerto puede emit...

Страница 74: ...t pas remplacée correctement Ne la remplacer que par une pile de type semblable ou équivalent recommandée par le fabricant Jeter les piles usagées conformément aux instructions du fabricant Warnung Bei Einsetzen einer falschen Batterie besteht Explosionsgefahr Ersetzen Sie die Batterie nur durch den gleichen oder vom Hersteller empfohlenen Batterietyp Entsorgen Sie die benutzten Batterien nach den...

Страница 75: ...den veroorzaken of het metalen voorwerp aan de aansluitklemmen lassen Varoitus Ennen kuin työskentelet voimavirtajohtoihin kytkettyjen laitteiden parissa ota pois kaikki korut sormukset kaulakorut ja kellot mukaan lukien Metalliesineet kuumenevat kun ne ovat yhteydessä sähkövirran ja maan kanssa ja ne voivat aiheuttaa vakavia palovammoja tai hitsata metalliesineet kiinni liitäntänapoihin Avertisse...

Страница 76: ...s y relojes Los objetos de metal se calientan cuando se conectan a la alimentación y a tierra lo que puede ocasionar quemaduras graves o que los objetos metálicos queden soldados a los bornes Varning Tag av alla smycken inklusive ringar halsband och armbandsur innan du arbetar på utrustning som är kopplad till kraftledningar Metallobjekt hettas upp när de kopplas ihop med ström och jord och kan fö...

Страница 77: ...etworks router dan ook oververhit raakt dient u deze niet te bedienen op een plaats waar de maximale aanbevolen omgevingstemperatuur van 40 C wordt overschreden Om te voorkomen dat de luchtstroom wordt beperkt dient er minstens 15 2 cm speling rond de ventilatie openingen te zijn Varoitus Ettei Juniper Networks switch sarjan reititin ylikuumentuisi sitä ei saa käyttää tilassa jonka lämpötila ylitt...

Страница 78: ...r deixe pelo menos um espaço de 15 2 cm à volta das aberturas de ventilação Atención Para impedir que un encaminador de la serie Juniper Networks switch se recaliente no lo haga funcionar en un área en la que se supere la temperatura ambiente máxima recomendada de 40 C Para impedir la restricción de la entrada de aire deje un espacio mínimo de 15 2 cm alrededor de las aperturas para ventilación Va...

Страница 79: ...rse según todas las leyes y regulaciones nacionales Varning Slutlig kassering av denna produkt bör skötas i enlighet med landets alla lagar och föreskrifter Action to Take After an Electrical Accident If an electrical accident results in an injury take the following actions in this order 1 Use caution Be aware of potentially hazardous conditions that could cause further injury 2 Disconnect power f...

Страница 80: ...écaution suffisante pour raccorder physiquement ces interfaces au câblage de l installation extérieure CAUTION Before removing or installing components of a device connect an electrostatic discharge ESD grounding strap to an ESD point and wrap and fasten the other end of the strap around your bare wrist Failure to use an ESD grounding strap could result in damage to the device Attention Avant de r...

Страница 81: ... within marked electrical ratings and product usage instructions To ensure that the device and peripheral equipment function safely and correctly use the cables and connectors specified for the attached peripheral equipment and make certain they are in good condition You can remove and replace many device components without powering off or disconnecting power to the device as detailed elsewhere in...

Страница 82: ...ies KN 32 and KN 35 KN 61000 Series BSMI CNS 13438 TEC SD DD EMC 221 05 OCT 16 Environmental Reduction of hazardous Substances ROHS 6of6 with no exemptions 7a exemption for power supply components acceptable Homologation Argentina EQUIPO DE USO IDÓNEO ETSI TL 9000 CLEI TNC IF PEP TAA SKUs WEEE REACH 76 ...

Страница 83: ...iving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help CAUTION Any changes or modifications not expressly approved by the party responsible for compliance could void the user s authority to operate this equipmen...

Страница 84: ...leakage of flammable liquid or gas A battery subjected to extremely low air pressure may result in an explosion or the leakage of flammable liquid or gas Installation should be done only by a trained electrician who knows all installation procedures and device specifications Do not ingest battery Chemical burn hazard This product contains a coin button cell battery If the coin button cell battery ...

Отзывы: