background image

Quick Start Guide

QFX5200-32C and QFX5200-32C-L Quick Start Guide

IN THIS GUIDE

System Overview | 1

Tools and Parts Required for Installation | 2

Part 1, Mounting the Switch into a 4 Post Rack | 3

Part II. Ground the Chassis and Connect Power | 5

Connect Power to the Switch | 5

Part III. Connect the QFX5200-32C or QFX5200-32C-L to the Nework and Perform Initial Configuration | 6

QFX5200-32C and QFX5200-32C-L Safety Warning Summary | 8

System Overview

The Juniper Networks QFX5200-32C and QFX5200-32C-L are compact 1 U standalone Ethernet switches that provides

a line rate configuration packet performance, very low latency, and a rich set of Layer 3 features. The routing engine and

control plane are driven by the 1.8 Ghz quad-core Intel CPU with 16 GB of memory and two 32 GB solid-state drives

(SSD) for storage.

The QFX5200-32C and QFX5200-32C-L comes standard with redundant fans and redundant power supplies. Switches

can be ordered with either ports-to-FRUs or FRUs-to-ports airflow. The QFX5200-32C is available with AC or DC power

supplies; the QFX5200-32C-L is available only with AC power supplies.

The QFX5200-32C models run standard Junos Operating System (OS) and is supported as a standalone switch, (Junos

OS Release 15.1X53-D30 and later), a member in a QFX5200-32C Virtual Chassis (Junos OS Release 17.3R2 and later,

or as a; satellite device in a Junos Fusion Provider Edge system (Junos OS Release 18.1R1and later). The QFX5200-32C-L

models run Junos OS Evolved and is supported as a standalone switch (Junos OS Evolved Release 18.3R1 and later).

Содержание QFX5200-32C

Страница 1: ...and control plane are driven by the 1 8 Ghz quad core Intel CPU with 16 GB of memory and two 32 GB solid state drives SSD for storage The QFX5200 32C and QFX5200 32C L comes standard with redundant fans and redundant power supplies Switches can be ordered with either ports to FRUs or FRUs to ports airflow The QFX5200 32C is available with AC or DC power supplies the QFX5200 32C L is available only...

Страница 2: ...0 10A L or equivalent two 10 32 x 0 25 screws with 10 split lock washers to secure the grounding lug to the grounding lug bracket protective earthing terminal Provided Two power cords with plugs appropriate to your geographical location Provided RJ 45 cable and RJ 45 to DB 9 serial port adapter Not Provided A Management host such as a laptop or PC with an Ethernet port Provided An Ethernet cable w...

Страница 3: ...m bottom to top in order of decreasing weight The switch weighs approximately 23 5 lb 10 66 kg Installing the QFX5200 32C in a rack or cabinet requires two people to lift the switch and secure it to the rack 3 Align the holes in the side mounting rail with the holes on the side of the chassis as shown in Figure 1 Figure 1 Align Side Mounting Rail with Chassis Holes 4 Attach the side mounting rail ...

Страница 4: ...g the blades to the rack Use the four mounting screws and cage nuts and washers if your rack requires them to attach each blade to the rack Tighten the screws Figure 3 Slide Mounting Blade into Mounting Rail g004478 9 Ensure that the switch chassis is level by verifying that all the screws on the front of the rack are aligned with the screws at the back of the rack 4 ...

Страница 5: ...g terminal on the protective earthing terminal bracket 4 Secure the grounding lug to the protective earthing terminal with two nuts 5 Dress the grounding cable and ensure that it does not touch or block access to other device components and that it does not drape where people could trip over it Connect Power to the Switch The QFX5200 32C and QFX5200 32C L ships with two factory installed power sup...

Страница 6: ...s on the console server or PC Baud Rate 9600 Flow Control None Data 8 Parity None Stop Bits 1 DCD State Disregard To connect and configure the switch from the console 1 Connect the console port to a laptop or PC using the supplied RJ 45 cable and RJ 45 to DB 9 adapter The console CON port is located on the management panel of the switch 2 Log in as root There is no password If the software booted ...

Страница 7: ...and prefix length for the switch management interface For QFX5200 32C systems edit root set interfaces em0 unit 0 family inet address address prefix length For QFX5200 32C L systems edit root set interfaces re0 mgmt 0 unit 0 family inet address address prefix length CAUTION Although the CLI permits you to configure two management Ethernet interfaces within the same subnet only one interface is usa...

Страница 8: ...y or death Permit only trained and qualified personnel to install or replace switch components Perform only the procedures described in this quick start and the QFX5200 documentation Other services must be performed only by authorized service personnel Before installing the switch read the planning instructions in the QFX5200 documentation to make sure that the site meets power environmental and c...

Страница 9: ...to track the returned material at the factory and to return repaired or new components to the customer as needed For more information about return and repair policies see the customer support Web page at https www juniper net support guidelines html For product problems or technical support issues contact the Juniper Networks Technical Assistance Center JTAC by using the Case Manager link at https...

Отзывы: