Tools and Parts Required for Installation

TIP:

The Quick Start Guide is designed to show the basic installation and startup procedures. For complete

instructions see the QFX5200 Hardware Guide at

QFX5200 Switch Hardware Guide

Gather the tools and equipment listed in

Table 1

for installing the switch in a 4 post rack.

Table 1: Tools and Equipment Needed to Install QFX5200-32C and QFX5200-32C-L

Provided/Not

Tools and Equipment

Not provided

Electrostatic discharge (ESD) grounding strap

Not provided

A Phillips (+) screwdriver, number 2

Provided

One pair of rear mounting blades

Provided

One pair of front mounting rails

Provided

Twelve crews to secure the mounting rails to the chassis

Not provided

Eight screws to secure the chassis and rear installation blades to the rack

Not provided

Grounding lug, Panduit LCD10-10A-L or equivalent, two 10-32 x 0.25 screws with #10

split-lock washers to secure the grounding lug to the grounding lug bracket protective earthing

terminal

Provided

Two power cords with plugs appropriate to your geographical location

Provided

RJ-45 cable and RJ-45 to DB-9 serial port adapter

Not Provided

A Management host, such as a laptop or PC, with an Ethernet port

Provided

An Ethernet cable with an RJ-45 connector attached

Register product serial numbers on the Juniper Networks website and update the installation base data if there is any

addition or change to the installation base or if the installation base is moved. Juniper Networks will not be held accountable

for not meeting the hardware replacement service-level agreement for products that do not have registered serial numbers

or accurate installation base data.

Register your product(s) at

https://tools.juniper.net/svcreg/SRegSerialNum.jsp

.

Update your install base at

https://www.juniper.net/customers/csc/management/updateinstallbase.jsp

.

2

Содержание QFX5200-32C

Страница 1: ...and control plane are driven by the 1 8 Ghz quad core Intel CPU with 16 GB of memory and two 32 GB solid state drives SSD for storage The QFX5200 32C and QFX5200 32C L comes standard with redundant fans and redundant power supplies Switches can be ordered with either ports to FRUs or FRUs to ports airflow The QFX5200 32C is available with AC or DC power supplies the QFX5200 32C L is available only...

Страница 2: ...0 10A L or equivalent two 10 32 x 0 25 screws with 10 split lock washers to secure the grounding lug to the grounding lug bracket protective earthing terminal Provided Two power cords with plugs appropriate to your geographical location Provided RJ 45 cable and RJ 45 to DB 9 serial port adapter Not Provided A Management host such as a laptop or PC with an Ethernet port Provided An Ethernet cable w...

Страница 3: ...m bottom to top in order of decreasing weight The switch weighs approximately 23 5 lb 10 66 kg Installing the QFX5200 32C in a rack or cabinet requires two people to lift the switch and secure it to the rack 3 Align the holes in the side mounting rail with the holes on the side of the chassis as shown in Figure 1 Figure 1 Align Side Mounting Rail with Chassis Holes 4 Attach the side mounting rail ...

Страница 4: ...g the blades to the rack Use the four mounting screws and cage nuts and washers if your rack requires them to attach each blade to the rack Tighten the screws Figure 3 Slide Mounting Blade into Mounting Rail g004478 9 Ensure that the switch chassis is level by verifying that all the screws on the front of the rack are aligned with the screws at the back of the rack 4 ...

Страница 5: ...g terminal on the protective earthing terminal bracket 4 Secure the grounding lug to the protective earthing terminal with two nuts 5 Dress the grounding cable and ensure that it does not touch or block access to other device components and that it does not drape where people could trip over it Connect Power to the Switch The QFX5200 32C and QFX5200 32C L ships with two factory installed power sup...

Страница 6: ...s on the console server or PC Baud Rate 9600 Flow Control None Data 8 Parity None Stop Bits 1 DCD State Disregard To connect and configure the switch from the console 1 Connect the console port to a laptop or PC using the supplied RJ 45 cable and RJ 45 to DB 9 adapter The console CON port is located on the management panel of the switch 2 Log in as root There is no password If the software booted ...

Страница 7: ...and prefix length for the switch management interface For QFX5200 32C systems edit root set interfaces em0 unit 0 family inet address address prefix length For QFX5200 32C L systems edit root set interfaces re0 mgmt 0 unit 0 family inet address address prefix length CAUTION Although the CLI permits you to configure two management Ethernet interfaces within the same subnet only one interface is usa...

Страница 8: ...y or death Permit only trained and qualified personnel to install or replace switch components Perform only the procedures described in this quick start and the QFX5200 documentation Other services must be performed only by authorized service personnel Before installing the switch read the planning instructions in the QFX5200 documentation to make sure that the site meets power environmental and c...

Страница 9: ...to track the returned material at the factory and to return repaired or new components to the customer as needed For more information about return and repair policies see the customer support Web page at https www juniper net support guidelines html For product problems or technical support issues contact the Juniper Networks Technical Assistance Center JTAC by using the Case Manager link at https...

Отзывы: