Tools and Parts Required for Installation
TIP:
The Quick Start Guide is designed to show the basic installation and startup procedures. For complete
instructions see the QFX5200 Hardware Guide at
Gather the tools and equipment listed in
for installing the switch in a 4 post rack.
Table 1: Tools and Equipment Needed to Install QFX5200-32C and QFX5200-32C-L
Provided/Not
Tools and Equipment
Not provided
Electrostatic discharge (ESD) grounding strap
Not provided
A Phillips (+) screwdriver, number 2
Provided
One pair of rear mounting blades
Provided
One pair of front mounting rails
Provided
Twelve crews to secure the mounting rails to the chassis
Not provided
Eight screws to secure the chassis and rear installation blades to the rack
Not provided
Grounding lug, Panduit LCD10-10A-L or equivalent, two 10-32 x 0.25 screws with #10
split-lock washers to secure the grounding lug to the grounding lug bracket protective earthing
terminal
Provided
Two power cords with plugs appropriate to your geographical location
Provided
RJ-45 cable and RJ-45 to DB-9 serial port adapter
Not Provided
A Management host, such as a laptop or PC, with an Ethernet port
Provided
An Ethernet cable with an RJ-45 connector attached
Register product serial numbers on the Juniper Networks website and update the installation base data if there is any
addition or change to the installation base or if the installation base is moved. Juniper Networks will not be held accountable
for not meeting the hardware replacement service-level agreement for products that do not have registered serial numbers
or accurate installation base data.
Register your product(s) at
https://tools.juniper.net/svcreg/SRegSerialNum.jsp
Update your install base at
https://www.juniper.net/customers/csc/management/updateinstallbase.jsp
2