![Jungheinrich ETV 110 Скачать руководство пользователя страница 140](http://html1.mh-extra.com/html/jungheinrich/etv-110/etv-110_operating-instructions-manual_2032042140.webp)
0
0
3
3
.
.
1
1
3
3
E
E
N
N
4
4
3.
3. Not permis
Not permissible as oper
sible as operating temp
ating temperatu
erature.
re.
4
4..2
2
O
Op
pe
erra
attiio
on
n
4.2
4.2.1
.1 Com
Commis
missio
sionin
ning un
g unfill
filled b
ed batt
atteri
eries
es
Z
Z
The operations required must be carried out by the manufacturer's customer
The operations required must be carried out by the manufacturer's customer
service department or a customer service organisation authorised by the
service department or a customer service organisation authorised by the
manufacturer.
manufacturer.
4.2
4.2.2
.2 Com
Commis
missio
sionin
ning fille
g filled and ch
d and charg
arged bat
ed batter
teries
ies
Checks and operations to be performed before starting daily work
Checks and operations to be performed before starting daily work
Procedure
Procedure
•• Make s
Make sure the b
ure the battery i
attery is in phy
s in physical
sically goo
ly good cond
d condition.
ition.
•• Make su
Make sure the
re the terminals are
terminals are correct (positive
correct (positive to positive
to positive and negativ
and negative to n
e to negative)
egative)
and check that contacts on the
and check that contacts on the battery terminal conducting system are secure.
battery terminal conducting system are secure.
•• Chec
Check the termi
k the terminal scre
nal screw torque
w torques (M10 = 23 ±1 Nm) of the term
s (M10 = 23 ±1 Nm) of the terminal con
inal conduct
ductors and
ors and
connectors.
connectors.
•• Ch
Char
arge u
ge up th
p the ba
e batte
ttery
ry..
•• Che
Check t
ck the e
he elec
lectro
trolyt
lyte lev
e level.
el.
Z
Z
The electrolyte level must be above the cell baffle or the top of the separator.
The electrolyte level must be above the cell baffle or the top of the separator.
•• Add ele
Add electroly
ctrolyte with di
te with distille
stilled water up t
d water up to the nom
o the nominal le
inal level.
vel.
Checks completed.
Checks completed.
4.
4.2.
2.3
3 Di
Disc
scha
harg
rgin
ing th
g the ba
e batte
ttery
ry
Z
Z
To achieve an optimum useful life avoid operational discharge of more than 80% of
To achieve an optimum useful life avoid operational discharge of more than 80% of
nominal capacity (full discharge). This corresponds to a minimum electrolyte
nominal capacity (full discharge). This corresponds to a minimum electrolyte
density of 1.13 kg/l at the end of the discharge. Recharge a discharged battery
density of 1.13 kg/l at the end of the discharge. Recharge a discharged battery
immediately.
immediately.
https://www.besttruckmanuals.com/
Содержание ETV 110
Страница 3: ...1 1 0 0 0 0 9 9 G G B B 2 2 https www besttruckmanuals com ...
Страница 5: ...0 0 9 9 0 0 3 3 G G B B 2 2 https www besttruckmanuals com ...
Страница 7: ...0 0 1 1 0 0 8 8 G G B B https www besttruckmanuals com ...
Страница 11: ...1 1 0 0 0 0 9 9 G G B B https www besttruckmanuals com ...
Страница 13: ...0 0 5 5 0 0 6 6 G G B B https www besttruckmanuals com ...
Страница 51: ...D 9 D 9 0 0 3 3 1 1 2 2 G G B B https www besttruckmanuals com ...
Страница 54: ...0 0 8 8 1 1 2 2 G G B B E 2 E 2 3 3 1 11 1 4 4 12 12 13 13 1 1 2 2 14 14 https www besttruckmanuals com ...
Страница 56: ...0 0 8 8 1 1 2 2 G G B B E 4 E 4 3 3 1 11 1 4 4 12 12 13 13 1 1 2 2 14 14 https www besttruckmanuals com ...
Страница 135: ...F 19 F 19 0 0 2 2 1 1 0 0 G G B B https www besttruckmanuals com ...