C 1
1205
.GB
C Transport and Commissioning
1
Lifting by crane
M
Only use lifting gear with sufficient capacity.
(AMX-E: Transport weight
=
net weight
+
battery weight;
see
truck
data plate)
Z
Strap points are provided for transporting the truck with crane lifting gear.
– Park the truck securely (see
Chapter E).
– Secure the lifting slings to the
attachment points.
M
Attach the crane slings to the
strap points so that the truck
cannot slip.
Lifting slings should be
fastened to the harness in such
a way that they do not come
into contact with any parts of
the truck when it is being
raised.
2
Securing the truck during transport
F
The truck must be securely fastened when transported on a lorry or a trailer.
The lorry / trailer must have fastening rings.
– Tighten the tensioning belts
over the forks to secure the
truck. Attach tensioning belts
to the fastening rings.
– Tighten the tensioning belt
with the tensioner.
M
Loading must be carried out by
specially trained staff in
accordance with
recommendations contained in
Guidelines VDI 2700 and
VDI 2703. In each case correct
measurements shall be
determined and appropriate
safety measures adopted.
C 1
1205
.GB
C Transport and Commissioning
1
Lifting by crane
M
Only use lifting gear with sufficient capacity.
(AMX-E: Transport weight
=
net weight
+
battery weight;
see
truck
data plate)
Z
Strap points are provided for transporting the truck with crane lifting gear.
– Park the truck securely (see
Chapter E).
– Secure the lifting slings to the
attachment points.
M
Attach the crane slings to the
strap points so that the truck
cannot slip.
Lifting slings should be
fastened to the harness in such
a way that they do not come
into contact with any parts of
the truck when it is being
raised.
2
Securing the truck during transport
F
The truck must be securely fastened when transported on a lorry or a trailer.
The lorry / trailer must have fastening rings.
– Tighten the tensioning belts
over the forks to secure the
truck. Attach tensioning belts
to the fastening rings.
– Tighten the tensioning belt
with the tensioner.
M
Loading must be carried out by
specially trained staff in
accordance with
recommendations contained in
Guidelines VDI 2700 and
VDI 2703. In each case correct
measurements shall be
determined and appropriate
safety measures adopted.
Содержание AMX 10 Inox Pro Ex
Страница 1: ...Operating instructions 51021985 AMX E 10 INOX INOX PRO AMX 10 INOX PRO Ex G 12 05 07 08...
Страница 3: ...0108 GB...
Страница 7: ...1205 GB A 2...
Страница 12: ...B 5 0708 GB AMX Inox Inox Pro Inox Pro Ex...
Страница 13: ...0708 GB B 6 AMX E Inox Inox Pro...
Страница 33: ...1205 GB E 10...