C
D
A
A
D
E
E
B
B
F
F
C
ing hole
10
Continue to attach springs in the same sequence as above: in the middle of of each section, making sure the
next spring is attached on the opposite side to even out the tension.
Important: The stitched bed is designed like elastic to be bounc y, which means that during construction it may
look like it won’t fit. Please note that it will stretch to the correct size when attaching the springs, this may take
some force.
The stitched bed is now filled and you have completed step 3.
This diagram shows the initial order of spring attachment.
= Top spring hole
= Bottom spr
Important: Attach the springs in the
order shown in the diagram. This will
help to distribute the tension, making
assembly easier.
Firstly, locate the 2 colored V-rings.
These V-rings are to be attached at
points 1 and 2 using a silver spring.
Then attach gold springs 3 to 20 in
the order shown in the diagram.
These are all gold top springs that
attach to the POD-connector, as
shown below:
Important: Remenber to include the
‘under spring’ holes when counting
the V-rings on the frame and bed.
Once all of the springs shown in the
diagram have been fitted, the remain-
ing springs can be attached.
Then please attached the ‘under
springs’ (10) to the underside of the
toprail.
1
17
13
15
19
14
18
16
20
2
3
7
4
8
5
10
6
9