![JUKI LZ-2290A/IP-110A/SC-915 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/juki/lz-2290a-ip-110a-sc-915/lz-2290a-ip-110a-sc-915_instruction-manual_2029975009.webp)
6
4-6. Connecting the power switch cord
(Japan and general export area)
1) Loosen screw
1
located on the sde of the power
swtch suppled as accessores and remove the
power swtch cover.
2) Connectng the nput power cord of electrcal box
¡
When the input power cord of electrical box is 4P
Put 4P cord from hole A of the power swtch and
securely fix green/yellow cord to
5
, whte cord to
2
,
black cord to
3
and red cord to
4
wth screws.
¡
When the input power cord of electrical box is 3P
Put 3P cord from hole A of the power swtch and
securely fix green/yellow cord to
5
, brown cord to
2
and sky blue cord to
3
wth screws.
3) Connectng the power cable suppled as accessores
¡
In case of 3-phase power cable
Put power cable from hole B of the power swtch, and
securely fix green/yellow cord to
9
, whte cord to
6
,
black cord to
7
and red cord to
8
wth screws.
¡
In case of single phase power cable
Put power cable from hole B of the power swtch,
and securely fix green/yellow cord to
9
and other
cords to
6
and
7
wth screws.
8
s not used.
4) Installng the power swtch cover
Securely tghten screw
1
located on the sde of
the power swtch.
4-7. Installing the operation panel (IP-110)
1) Install operaton panel
1
on the machne head
usng screws
3
whch have been assembled to
panel nstallng bracket
2
.
4-5. Installing the electrical box
Install the electrcal box on the under sde of the
table usng round-head bolts
1
, plan washers
2
,
sprng washers
3
and nuts
4
suppled wth the ma-
chne at the locaton llustrated, and usng bolt havng
hexagonal ndentaton on the head
5
, sprng washer
6
and plan washer
7
suppled wth the machne at
the locaton llustrated.
Do not disassemble the operation pan
-
el to prevent it from breakage.
1
6
9
B
7
8
3
4
5
2
1
2
5
4
3
6
7
1
2
3
3
3
A