![JUKI KE-750 Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/juki/ke-750/ke-750_setup-manual_2029445044.webp)
-
11
-
7 .
HOD (Handheld Operating Device) Box
See the HOD box packing assembly (E53027000A0) to pack the HOD box.
8 .
Vision Monitor
Repack only the monitor in the carton box which the manufacturer specified.
q
Do not disassemble the stand part from the mounter main unit.
w
Put air cap in the carton box when there is any gap in the
carton box after repacking the monitor.
e
Paste an adhesive tape whose width is 50 mm over the
carton box after repacking the monitor to close the carton
box.
CAUTION
!
Carton
Monitor
Stand part
Figure 8.1
Figure 8.2
Содержание KE-750
Страница 2: ...SET UP GUIDE...
Страница 23: ...20 Figure 9 4 Figure 9 3 Adjust screw Conveyor fixing screw long hole 6 portions 104 or less...
Страница 32: ...MAIN UNIT UNPACKING GUIDE Main Unit Packing Guide...
Страница 58: ...1 Specifications are subject to be changed without notice Revision Date 00 1997 07...