![JUKI JX-100 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/juki/jx-100/jx-100_operation-manual_2029438013.webp)
Operation manual
Ⅰ
2
−
3
Step 2 Warm up the machine.
If you warm up the machine before PWB production, the machine can start PWB
production stably.
①
②
The “Warming-up” screen appears. Make the settings for the warming-up conditions.
③
Check to see if the safety cover is closed, and press the <START> switch of the
operation panel.
When you press the <START> switch, the machine starts moving.
To avoid risk of injury, never put your hand or head inside the
machine
Select
* Refer to Section 2.4 “Warming
Up” of the “Instruction Manual
CD” for details of the
“Warming-up” screen.
Select what to be warmed up.
Enter the time duration when the
machine stops, the number of
times the machine stops at which
the machine stops.
<Operation panel>
Press the
<START>
switch.
The axes and the conveyor start moving
and the warming up operation starts.
To finish the warming-up operation,
press the
<STOP>
switch.
(When you select the <Time> (Count) button, the
warming-up operation finishes when the specified time
passes or when the number of times the machine
warms up reaches the specified value.)
WARNING
Select the warming-up conditions.