
–2–
–2–
–2–
Whenthep.c.b.isinstalled,insertthecabletoSC-90following"InstructionManualforDLU-5494N-7/
SC-90/M-9/IP-0C/KT-0",andconnectthecabletoKT-0(EPF)p.c.b.followingthestepsbelow.
9. Afterinsertingtheconnector,putallcords
togetherwithcableclipband
!4
locatedonthe
sideofthebox.
Atthistime,bundletheconnectorswhichare
arrangedabovethewiresaddletowiresaddle
!5
andthosewhicharearrangedbelowthewire
saddletowiresaddle
!6
.
* For installing from M-91 motor to SC-910 control box or installing SC-910 control box on the table,
refer to "Instruction Manual for DLU-5494N-7/SC-910/M-91/IP-110C/KT-01".
1. Fix the cord clamp and the cable clip band following the attaching procedure.
(Refer to "Instruction Manual for DLU-5494N-7/SC-910/M-91/IP-110/KT-01".)
2. When removing the connector, remove it from the wire saddle and remove it while pressing the
hook of the cable clip band.
4. SecurelyfixKT-0(EPF)p.c.b.A(asm.)
1
to
thecontrolboxmainunitusingthreescrews
4
suppliedwiththeunitasaccessories.
3. InsertKT-0(EPF)p.c.b.A(asm.)
1
toconnector
CN47
3
ofthemainunitasillustrated.
Do not forcibly press the circuit board.
5. Connect6Pconnector
5
comingfromthe
machineheadtoconnector
9
(CN39).
6. Connect4Pconnector
6
comingfromthe
machineheadtoconnector
!0
(CN34).
7. Connect4Pconnector
7
comingfromthe
operationdisplaypaneltoconnector
!1
(CN32).
8. InsertKT-0(EPF)relayconnector
8
to
connector
!2
(CN4)andconnector
!3
(CN42).
1
3
4
!5
!4
!6
5
9
6
7
!3
!1
8
!0
!2
When the connectors are not properly
connected, the p.c.b. does not work
normally.