pag
Before you install the basinet, make sure the top 4 rails are well positioned
(straight and fix).
. Join the zipper ar the beginning. (Fig.18.)
Move
the zipper all the way around the travel cot. (Fig. 19)
When you reach the end of the zipper, cover it with the velcro, so that there
are no parts protruding in such a way that it may hurt the baby. (Fig. 20)
Insert the tubes into the base of the bassinet. (Fig 21)
Join the tubes, so that it becomes one. (Fig 22)
Place the mattress in the bassinet.
Содержание Sweet Naps
Страница 1: ...User Manual Sweet Naps...
Страница 2: ...pag 1 2 3 4 5 6 7 8 9 10 11 12...
Страница 3: ...pag 14 15 13 16 18 17 19 20 21 22...
Страница 4: ...pag...
Страница 13: ...pag 13 3 4 3 5 4 6 5 7 6 8 7 9 1 2 1 2 50 8 3 9 10 4 11...
Страница 14: ...pag 14 5 12 6 13 1 14 15 2 16 17 1 4 2 3 18 19 4 20 5 21 6 22 7...
Страница 15: ...pag 15...
Страница 16: ...pag 16 15 16 17 18...
Страница 26: ...61 Sos Pipera Street Bucharest ROMANIA 020111...