JUDO QUICKSOFT-DUO
9
Installation
tion and in case of any defects that occur
in the system, precise compliance with
the details given in the “Installation”
chapter is necessary!
–
If the wastewater cannot be safely and
completely discharged, the house and
installations can be damaged by water.
–
A shut-off valve must be installed
upstream and downsteam of the
softener with a bypass to allow
continued water supply when the
softener is out of service! This enables
the water supply to the softener to be
interrupted during installation, servicing/
maintenance, repairs and in case of
malfunctions. Floods and serious water
damage to house installations can there-
fore be avoided.
–
The unit can be installed in all standard
drinking water pipes.
–
It is not permitted to install the softener
upstream of the
water meter!
4.1.2 Installing position
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
Always install the softener in a vertical posi-
tion (± 5°)!
Failure to observe this can impair its function.
4.1.3 Power supply
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
The mains voltage may not be interrupted
(e. g. by light switches). If the power supply
is interrupted during regeneration,
–
no regeneration takes place.
–
no alarm is given in case of faults.
–
water losses or even water damage can
occur.
4.1.4 Mounting the built-in rotary
flange
The built-in rotary flange is used as a
connecting element between the pipe and
the softener.
It is suitable for both horizontal and vertical
pipes.
The installation height depends on the pipe
layout. The minimum installation height from
the floor to the rotary flange is 40 cm.
The built-in rotary flange must be
installed in flow direction which is
marked by a cast in arrow (see Fig. 3)
.
Failure to comply with this means the
softener cannot work.
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
A power connection (230 V, 50 Hz),
which is permanently live, must be
available.
A splash proof socket is required
for the power pack, in accordance
with the legal regulations for wet
rooms.
Fig. 3:
Built-in rotary flange
Содержание QUICKSOFT-DUO
Страница 3: ...JUDO QUICKSOFT DUO 3...
Страница 26: ...26 JUDO QUICKSOFT DUO JQS D Spare Parts...
Страница 27: ...JUDO QUICKSOFT DUO 27 JQS D Spare Parts...