background image

JUDO QUICKSOFT-DUO

9

Installation

tion and in case of any defects that occur
in the system, precise compliance with
the details given in the “Installation”
chapter is necessary!

If the wastewater cannot be safely and
completely discharged, the house and
installations can be damaged by water.

A shut-off valve must be installed
upstream and downsteam of the
softener with a bypass to allow
continued water supply when the
softener is out of service! This enables
the water supply to the softener to be
interrupted during installation, servicing/
maintenance, repairs and in case of
malfunctions. Floods and serious water
damage to house installations can there-
fore be avoided.

The unit can be installed in all standard
drinking water pipes.

It is not permitted to install the softener

upstream of the 

water meter! 

4.1.2 Installing position

ATTENTION

(see chapter “Safety information and
dangers due to non-compliance”)

Always install the softener in a vertical posi-
tion (± 5°)!
Failure to observe this can impair its function.

4.1.3 Power supply

ATTENTION

(see chapter “Safety information and
dangers due to non-compliance”)

The mains voltage may not be interrupted
(e. g. by light switches). If the power supply
is interrupted during regeneration,

no regeneration takes place.

no alarm is given in case of faults.

water losses or even water damage can
occur.

4.1.4 Mounting the built-in rotary 

flange

The built-in rotary flange is used as a
connecting element between the pipe and
the softener.

It is suitable for both horizontal and vertical
pipes.

The installation height depends on the pipe
layout. The minimum installation height from
the floor to the rotary flange is 40 cm.

The built-in rotary flange must be
installed in flow direction which is
marked by a cast in arrow (see Fig. 3)

.

Failure to comply with this means the
softener cannot work.

ATTENTION

(see chapter “Safety information and
dangers due to non-compliance”)

A power connection (230 V, 50 Hz),
which is permanently live, must be
available.

A splash proof socket is required
for the power pack, in accordance
with the legal regulations for wet
rooms.

Fig. 3:

Built-in rotary flange

Содержание QUICKSOFT-DUO

Страница 1: ...nstructions and safety information before installing and putting the unit into service These must always be issued to the owner user Installation and Operating Instructions JUDO QUICKSOFT DUO Softener...

Страница 2: ...holder JUDO Wasseraufbereitung GmbH 71364 Winnenden Germany All rights reserved Reprints even of extracts is only permitted with special approval Dear Customer thank you for the confidence you have sh...

Страница 3: ...JUDO QUICKSOFT DUO 3...

Страница 4: ...able at the place in which the softener is used This instruction manual is intended to make it easier to familiarize yourself with the softener and its possible intended uses The instruction manual co...

Страница 5: ...nd dangers due to non compliance In detail failure to observe the general danger symbols can result for example in the following risks failure of important functions of the softener danger to persons...

Страница 6: ...ing the instruction manual The manufacturer supplier must always be consulted before using the softener outside the use limitations given in the instruction manual The softeners are only to be used in...

Страница 7: ...2 Notes on special dangers 2 2 1 Electrical equipment installations Electrical devices equipment which are not splash proof and which are located near the softener can be damaged by water which escap...

Страница 8: ...t on the drinking water quality 4 Installation 4 1 General ATTENTION see chapter Safety information and dangers due to non compliance The unit may only be installed by skilled personnel The chapter on...

Страница 9: ...i tion 5 Failure to observe this can impair its function 4 1 3 Power supply ATTENTION see chapter Safety information and dangers due to non compliance The mains voltage may not be interrupted e g by l...

Страница 10: ...bly cover of the built in rotary flange The connection flange of the softener is covered by a white protective disc This pro tective disc is fastened with four cylinder head screws M6x25 Loosen all fo...

Страница 11: ...lushing the water pipe take off the assembly cover of the built in rotary flange Connect the bypass valve on the flange side with the cast in letter R pipe flange to the built in rotary flange by enga...

Страница 12: ...e wall support so far that it rests against the softener casing and the softener hangs vertically to the wall 4 1 9 Wastewater connection and back up overflow hose The hoses for the regeneration waste...

Страница 13: ...ng the raw water hardness Open the water inlet Open the bypass valve ATTENTION For safety reasons the softener must be vented immediately after it is connected to the water system bypass valve is open...

Страница 14: ...he DIP switch 21 contacts 1 to 4 see Fig 9 To make an adjustment the allocated contact of the DIP switch is moved to the position opposite to ON For raw water hardnesses less than 10 e all the DIP swi...

Страница 15: ...er depending on the raw water hardness and the mixed water hardness set In accordance with the current drinking water regulations the limit value for sodium in drinking water is 200 mg l This does not...

Страница 16: ...thetic resin spheres on which the calcium ions which make the water hard are exchanged for sodium ions This makes the water soft However the ion exchange resin only absorbs a limited quantity of hardn...

Страница 17: ...ter the regenerating salt shortage occurs 5 4 Modifications changes spare parts ATTENTION see chapter Safety information and dangers due to non compliance Only original spare parts are to be used Inde...

Страница 18: ...icantly differ from the setpoint values see chapter Service Record Sheet the customer service department must be notified Always quote the unit number 28 which is imprinted in the top of the unit conn...

Страница 19: ...ly see chapter Commissioning Late salt refill During regeneration the driving wheel was manually turned The drive turns the driving wheel until the normal operating position is reached again Then the...

Страница 20: ...d before use so that contaminations cannot get into the salt solution container The regenerating salt must be tipped directly from the opened package into the salt solution container Ensure that the s...

Страница 21: ...he maximum operating pressure is lower in order to ensure the optimum function of the softener For further information please refer to the Diagrams chapter Operating pressure Nominal pressure 2 7 bar...

Страница 22: ...hardness of 10 e depending on the volumetric flow rate Fig 12 Pressure loss in normal operating position Max possible quantity drawn off daily depending on the raw water hardness and a mixed water ha...

Страница 23: ...ty related to 1 m of mixed water with 10 e depending on the raw water hardness Fig 15 Wastewater quantity Salt consumption rela ted to 1 m of mixed water with 10 e depending on the raw water hardness...

Страница 24: ...per pipes can be laid Our recommendation Install a JUDO JULIA metering pump in the mixed water pipe downstream of the softener in order to proportionately enrich the water with a JUL mineral solution...

Страница 25: ...JUDO QUICKSOFT DUO 25 JQS D Spare Parts 10 JQS D Spare Parts 1 3 148 9 6 88 7 2 26 4 5 80 106 17 16 15 12 13 14 20 21 25 11 18 112 28 23 10 36...

Страница 26: ...26 JUDO QUICKSOFT DUO JQS D Spare Parts...

Страница 27: ...JUDO QUICKSOFT DUO 27 JQS D Spare Parts...

Страница 28: ...flow rate display yellow 13 Net display green 14 Switch over display yellow 15 Regeneration right display green 16 Trouble display red 17 Regeneration left display green 18 Manual pushbutton to trigg...

Страница 29: ...2 5 1 1200130 1 61 Clamping union nut 3 1140011 5 70 Control disc wheel 1 1120382 12 71 Cylinder head screw M5x35 5 1650215 2 73 Cylinder head screw M5x10 1 1621116 2 74 Expanding spring 2 1650186 2 7...

Страница 30: ...113 Tool cover 1 2200444 30 114 O ring 43x3 1 1200187 2 115 Impeller with magnet 1 2201258 33 116 O ring 13x2 5 1 1200236 1 141 Solenoid valve cable 1 2200714 31 142 Electrode cable 1 2200716 21 148...

Страница 31: ...ke time2 minutes approx 3 minutes Wastewater produced litres approx 3 5 litres Rinse3 3 4 5 litres Initial filtrate4 2 5 4 litres 1 Is completed by the customer service department S Total sum L extend...

Страница 32: ...Brussel Bruxelles Tel T l 32 0 24 60 12 88 Fax 32 0 24 61 18 85 e mail info benelux judo eu www judo eu JUDO France S r L 76 Rue de la Plaine des Bouchers Technosud F 67100 Strasbourg Tel 33 0 3 88 6...

Отзывы: