18
JUDO QUICKSOFT-DUO
Operation
Before carrying out any work on the soft-
ener, which extends beyond pure opera-
tional control, the softener must be depres-
surised! Failure to observe this can lead to
an uncontrolled escape of water and there-
fore lead to water damage in the building.
Strictly comply with the instructions given in
the “Installation” and “Maintenance” chap-
ters.
5.5
Stoppages
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
The water supply to the softener is inter-
rupted. The main tap is closed or the bypass
valve is switched over.
The softener must be stored in a dry, frost-
free place when dismantled. The connecting
flange must be protected against dirt and
damage.
If the softener is refitted and put back into
service, regeneration must always be
carried out first (see chapter “Commis-
sioning”).
Disconnect the power pack from
the socket! (If installed, disconnect
the power pack of the downstream
metering pump too!)
Disconnect the power pack from
the socket! (If installed, disconnect
the power pack of the downstream
metering pump too!)
Содержание QUICKSOFT-DUO JQS-D
Страница 26: ...26 JUDO QUICKSOFT DUO JQS D Spare Parts ...
Страница 27: ...JUDO QUICKSOFT DUO 27 JQS D Spare Parts ...