JUDO PROFIMAT-PLUS
15
Operation
5.
Operation
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
Imperatively observe the chapter “Intended
use”!
5.1
Commissioning
Before starting up (initial putting into service
or startup after maintenance work),
fill
the
filter with water and
vent
it!
–
To this end, after installation the filter is
filled with water by opening the upstream
shut-off valve.
–
The filter is now under mains pressure.
–
The enclosed air must then be imme-
diately removed from the filter in order to
avoid damage to the installation caused
by water hammers. The filter is vented
by means of backwashing (see chapter
“Backwashing”)
–
After backwashing and venting the filter
is ready for use.
5.2
Control lamps,
manual pushbuttons
Operation
Permanent green light:
the automatic
backwash protective filter is ready for use.
Green light flashing
: The filter is in rinsing
position while plugging in the power supply.
The LED “Operation” is blinking till the flush
valve is closed.
Flushing
Permanent yellow light
: Backwashing is
taking place.
Yellow light flashing
: Call for backwashing
when semi-automatic is set.
Red flashing light: The automatic back-
wash protective filter is not ready for use
(see chapter “Fault”).
Manual release
Push the manual pushbutton.
Triggers backwashing.
Indication of maintenance
All three control lamps flash at the same
time (see chapter “Warranty and services”).
Fig. 8:
Содержание PROFIMAT JPF-AT DN 100
Страница 3: ...JUDO PROFIMAT PLUS 3 ...
Страница 34: ...34 JUDO PROFIMAT PLUS Spare parts 10 Spare parts 10 1 JPF A 1 ...
Страница 37: ...JUDO PROFIMAT PLUS 37 Spare parts 10 2 JPF A 1 2 ...
Страница 40: ...40 JUDO PROFIMAT PLUS Spare parts 10 3 JPF A DN 65 100 ...