10
JUDO i-soft TGA 2
Installation
4.1.1 Requirements for the place of
installation
The installation room must be dry and
free from frost!
Unauthorised persons must not be able
to access the water softening system.
ATTENTION
(see chapter 1.2 “Safety instructions and
dangers due to non-observation”)
– The ambient temperature must not ex-
ceed 30 °C!
– So that it is possible to safely drain the
waste water (regeneration) during oper-
ation and also in the event that a system
defect occurs, the specifications given in
chapter 4 “Installation” must be precisely
followed!
If the waste water cannot be safely and
completely drained, it is possible that
property damage to the home and fur-
nishings may be caused by the water.
– A shut-off valve must be installed up-
stream of the water softening system if
no bypass valve (JQX) is fitted. This al-
lows the water supply to be disconnect-
ed for water softening system mainte-
nance, repairs or in case of malfunction.
– The device can be installed in all com-
mercially available drinking water pipes.
– Installation of the water softening system
upstream of the
water meter is forbid-
den!
4.1.2 Installation position
ATTENTION
(see chapter 1.2 “Safety instructions and
dangers due to non-observation”)
Always install the water softening system in
an upright position (± 5°)!
If this is not observed, incorrect functioning
may result.
4.1.3 Power supply
ATTENTION
(see chapter 1.2 “Safety instructions and
dangers due to non-observation”)
The mains voltage must not be interrupted
(e.g. via a light switch). If the water softening
system does not have a permanent power
connection,
– Regeneration will not take place,
– No fault warnings will be output.
– Water leakage or even water damage
may occur during a regeneration as a re-
sult of a loss of power.
4.2
Installation of the rotary flange
fitting
The rotary flange fitting serves as a connect-
ing piece between the pipe and the water
softening system.
It is suitable both for horizontal and vertical
pipes.
The installation height depends on the pipe
course. The minimum installation height
measured from the ground to the middle of
the pipe is 52 cm.
A permanent power connection
(230 V, 50 Hz) must be available.
A splash-proof socket, complying
with the legal regulations for wet are-
as, is required for the power supply
unit.
Содержание i-soft TGA 2
Страница 3: ...JUDO i soft TGA 2 3 ...
Страница 21: ...JUDO i soft TGA 2 21 Operation 5 4 Menu structure Fig 14 Menu structure ...
Страница 38: ...38 JUDO i soft TGA 2 Notes ...
Страница 39: ...JUDO i soft TGA 2 39 Notes ...