Installation
INFO_NO_HEADER
The installation height of the
rotary flange fitting from the floor
to the pipe centre is 114.5 cm.
INFO_NO_HEADER
A shut-off option must be avail-
able directly upstream and down-
stream of the rotary flange fit-
ting. In this way the water soft-
ening system can be decoupled
from the drinking water installa-
tion during hygiene flushing.
ATTENTION: When screwed in place,
neither frame nor pipe should be
strained. To balance out any stain,
the adjustable feet of the frame
can be easily adjusted to vary their
height.
The frame with the three-way manifold
has now been connected to the pipe.
Flush the pipe:
1.
Switch all bypass valves to bypass
by turning the three handwheels fully
clockwise.
2.
Open the shut-off valves upstream and
downstream of the rotary flange fitting
to flush the pipe.
3.
Reclose the shut-off valves upstream
and downstream of the rotary flange fit-
ting.
3.4
Connecting the device to pre-
installed bypass valve
Initial condition:
•
The frame is connected to the now
piped-up rotary flange fitting via the
three-way manifold.
•
All three bypass valves have be
switched to bypass and then the pipe
flushed.
INFO_NO_HEADER
ATTENTION!
Connect the water softening sys-
tems sequentially from left to right
(markings 1, 2 and 3 on the three-
way manifold) to the corresponding
bypass valves.
Fig. 3:
Bypass valve (JQX)
1
Handwheel
2
Pipe-side flange “R”
3
Device-side flange “G”
Procedure:
1.
Slightly unscrew the screws on the
connection flange of the device, how-
ever, do not screw out completely, and
remove the white protective cap.
DANGER
Risk of crushing: No not reach
into the open device connection!
2.
Check the seating of the profile flange
seal on the connection flange of the
device: The profiled side of the pro-
file flange seal must point towards the
bypass valve.
8