
Page 7 of 15
MP-CB (CE)
4. Connecting the control box to a MP cover fitment press
3. MP press connection – Connect pipe No.1 from the control
box to the No.1 connection on the MP press cylinder. Connect
pipe No.2 from the control box to the lower connection on the
press.
4. Connect the main air supply to the control box and check the
air pressure is 75 – 100 Psi.
Note: When the press is in standby waiting for termination there
should be no air leaks. If anything appears to be working
abnormally check all connections are correct or see the trouble
shooting section.
Содержание MP-CB (CE)
Страница 1: ...MP CB CE Operation manual ...
Страница 12: ...Page 11 of 15 MP CB CE 8 Counter To reset the counter to zero press the blue button ...
Страница 14: ...Page 13 of 15 MP CB CE 10 Pneumatic circuit diagrams MP CB CE used with MP termination press ...
Страница 15: ...Page 14 of 15 MP CB CE 8 Pneumatic circuit diagrams MP CB CE used with a MP cover fitment press or a YA tool ...