
Page 5 of 15
MP-CB (CE)
3. Connecting the control box to the MP termination press
3. MP press connection – Connect pipe No.1 from the control
box to the No.1 connection on the MP press cylinder.
Connect pipe No.2 from the control box to the lower
connection on the press.
4. Connect the main air supply to the control box and check the
air pressure is 75 – 100 Psi.
Содержание MP-CB (CE)
Страница 1: ...MP CB CE Operation manual ...
Страница 12: ...Page 11 of 15 MP CB CE 8 Counter To reset the counter to zero press the blue button ...
Страница 14: ...Page 13 of 15 MP CB CE 10 Pneumatic circuit diagrams MP CB CE used with MP termination press ...
Страница 15: ...Page 14 of 15 MP CB CE 8 Pneumatic circuit diagrams MP CB CE used with a MP cover fitment press or a YA tool ...