©JRI
4
II.
INSTALLING AND PLACING IN SERVICE
a)
Placing the case
The recorder’s front panel should be placed vertically.
It can be tilted backwards, but the angle should not be greater than 30°.
Built-in assembly
(see figure chapter 5)
Prepare the embedding cut-out.
Enter the body of the appliance into the cut-out after having placed the probe and capillary tube. Place
the appliance on the panel; put in place the bracket E, and the two Allen screws C. Tighten them
moderately.
Protrusive assembly
(see figure chapter 5)
Attach the strap S against the rear side of the case with the two countersunk-head screws (Ø 4, length
10).
Attach the appliance to the wall through the two lateral holes in the
strap S.
b)
Putting the probe in place
THERMOGRAPH
The capillary, supplied rolled on a circle of about 10 cm should be unrolled in the same plane as the
circle and not stretched in a perpendicular direction that would give it a wrenching movement
(minimum bending radius 10 mm).
The probe is introduced in the medium the temperature of which should be watched over.
The probe should be put in the most suitable place, while avoiding the influence of outside elements
(cooling, heat radiation…).
III.
IMPLEMENTATION AND USE
a)
Installing the battery (for the quartz mechanism)
The standard LR6 AA leak proof alkaline battery should be replaced every year.
CAUTION:
NEVER REMOVE THE CENTRAL SCREW OF THE KNURLED NUT
.
To achieve the operation:
1
2
3
4
- Open the recorder door
- Lift the pointer (1) so as to release the diagram (3).
- Unscrew the knurled nut (4) and remove the diagram (3).