USER MANUAL
MINIDISQUE REMOTE RECORDER
03112B
Страница 1: ...USER MANUAL MINIDISQUE REMOTE RECORDER 03112B...
Страница 2: ...4 III IMPLEMENTATION AND USE 4 a Installing the battery for the quartz mechanism 4 b Putting the fibre point pen in place 5 c Installing the diagram for a battery operated mechanism 5 d Connecting the...
Страница 3: ...h high pressure nitrogen connected to the recording case by a copper capillary tube with a standard length of 3 m Other probe and capillary lengths can be used The capillary can be made of stainless s...
Страница 4: ...holes in the strap S b Putting the probe in place THERMOGRAPH The capillary supplied rolled on a circle of about 10 cm should be unrolled in the same plane as the circle and not stretched in a perpen...
Страница 5: ...ecting the recorders to an outside power supply First check to make sure that the power supply s voltage complies with specified on the appliance s rating plate Connect the power supply s cables with...
Страница 6: ...15 C 5 25 C 25 25 C 10 40 C 0 120 C 30 130 C Connection Capillary tube length standard 3 m from 1 to 20m Weight Approximately 1 8kg b Thermograph features Accuracy 2 of measuring range at 23 C Number...
Страница 7: ...liance during prolonged stops To change the accessories see the following paragraphs III a Putting the battery in place b Putting the fibre point pen in place c Putting in place the diagram for batter...