Operating instructions
Installation
41
Run the cable (1) from the flow meter (2)
through the water meter connection (4) on
the control cabinet (3), and fix the cable in
position.
Fasten the two wires of cable (1) into
terminals 16 (5) and 15 (6) of terminal strip
6X01.
The monitoring system is connected in the
same way as the flow meter.
Run the cable (2) from the dosing pump (1)
through the dosing pump connection (4) on
the control cabinet (3), and fix the cable in
position.
Please note: Use pliers to properly tighten
the coupler of the connection cable.
Fasten both wires of the cable (2) in the
terminals 17 (5) (white contact) and 18 (6)
(black contact) of the terminal strip 6X01 in
the control cabinet (3).
The illustration shows dosing pump 12 L /
h, dosing pump 60 L / h is connected
accordingly.
1
2
Содержание 9800.002
Страница 6: ...Operating instructions Intended Use...
Страница 7: ......