Page 8
| 1-800-561-5550
H. Position the Mounting Plate :
Place the bottom
sill track on the door opening and make sure it is
positioned straight.
Insert the mounting plate endcap #13B into the
sill track and PVc opening.
i. Fastening the sill Track :
using the drill bit #6
drill pilot holes through the bottom sill track.
Note:
Depending on the width of your sill track
you may need to drill up to 5 holes.
Make sure to hold the sill track while drilling.
now fasten the sill track with the number of
screws required for your installation.
BOTTOM sill insTallaTiOn
I
H
H
2
#11
#13B
Up to 5
#18
#6
#13