
·
Beware of the flying spring and other
objects
Upon completion of the installation of
the throttle springs and throttle spring
stands, use special tools to install the
locking blocks for the throttle spring
stands.
1.11.3.4. Installation
of
the
throttle
thrusting rod and throttle
spacing by adjusting the
separation cushions
1.11.3.5.
Install the cylinder cover base,
make identification of the
marks for the front and rear
directions.
1.11.4. Assembling of dustproof sealing
strip and cylinder cover
1.11.4.1. Apply
lubricating oil at the
threads and grooves of the bolts.
1.11.4.2. The tightening of the cylinder
bolts should follow the sequence
as shown in the right figure. The
tightening is to be carried out in 2
—
3 operations till the torque
meets the specifications. The
torque for the first tightening
operation is 30
±
2N.m; the torque
for the second tightening operation
is 50
±
3N.m; and the torque for the
Содержание JNSZ1100SVB
Страница 6: ...Warranty policy...
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 41: ...13 ENGINE WIRING DIAGRAM...
Страница 96: ...95 46 ELECTRIC INJECTION SYSTE...
Страница 97: ...96...
Страница 98: ...97...
Страница 99: ...98...
Страница 100: ...99...
Страница 101: ...100...
Страница 102: ...101...
Страница 103: ...102...
Страница 104: ...103...
Страница 105: ...104...
Страница 106: ...105...
Страница 107: ...106...
Страница 108: ...107...
Страница 109: ...108...
Страница 110: ...109...
Страница 111: ...110...
Страница 112: ...111...
Страница 113: ...112...
Страница 114: ...113...
Страница 115: ...114...
Страница 116: ...115...
Страница 117: ...116...
Страница 118: ...117...
Страница 119: ...118...
Страница 120: ...119...
Страница 121: ...120...
Страница 122: ...121...
Страница 123: ...122...
Страница 124: ...123...
Страница 125: ...124...
Страница 126: ...125...
Страница 127: ...126...
Страница 128: ...127...
Страница 129: ...128...
Страница 130: ...129...
Страница 131: ...130...
Страница 132: ...131...
Страница 133: ...132...
Страница 134: ...133...
Страница 135: ...134...
Страница 136: ...135...
Страница 137: ...136...
Страница 138: ...137...
Страница 218: ...217 4 Attach tie rod and front wheel...
Страница 225: ...224 DEALER PRE DELIVERY INSPECTION...