All electrical aspects of the installation should be undertaken by a qualified electrician. 

Note that for safety, the pump and sensor connections should always be wired prior 

to connecting power to the solar control panel. 

IMPORTANT

  The solar control panel must have a permanent electrical power supply 

which must not be interrupted either manually or with a time switch. If the permanent 

electrical supply to the building is to be switched off for any period of time, the solar 

collector(s) should either be covered, or the system drained. In order to protect the 

normal operation of the control panel, it should be located at least 100 mm from in-

sulated pipes which may become hot during operation. Control panels use PT1000 

sensors containing twin core copper cable with a 0.75mm cross section. The sen-

sors supplied are 1.5 metres in length. Sensor cables can be extended with twin core 

copper cable of 0.75mm diameter up to 50 metres and 1.50mm diameter between 

50-100m. Screened cable should be used on the sensor cables to prevent RFI from 

electrical cables. All connections to extend the cables should be housed in a junction 

box for protection. The following diagrams show the connection of the solar pump 

and other relays on the Joule range of controllers. This should be read in conjunction 

with the Installation and Operation Manual supplied with each Joule control panel.  

Electrical Solar Controller

46

Содержание Navitas In-roof

Страница 1: ...NAVITAS IN ROOF joule navitas solar in roof flat panel installation manual INSTALL...

Страница 2: ...Installer Loyalty Scheme Coming Soon 2...

Страница 3: ...erview of materials 14 Overview of materials single row 16 Overview of materials double multiple row 17 Overview of tools 18 Mounting single row 34 Mounting double multiple row 43 Specifications 44 Pu...

Страница 4: ...nd manifold boxes should be transported horizontally Heavy goods should not be loaded on top of the kit boxes Care should be taken when opening boxes to prevent scratches or sudden shocks to the glass...

Страница 5: ...Required No of people using hot water in the house Any other exceptional water loads in the dwelling No of People Solar Cylinder Size Size of Flat Panel System Size of Evacuated Tube 2 Panel System 4m...

Страница 6: ...n take the anticipated load Where there is signs of discolouration a closer examination will be requried If black spots are found on the timber this indicates a leak which needs attention If the timbe...

Страница 7: ...isk to fire prevention by installing the solar system confirm Ensure that all wires are not in direct connection with any un insulated pipe work or plant that could cause a risk of burning confirm Leg...

Страница 8: ...Kit Components Solar Pump Solar Controller Solar Expansion Vessel Standard Kit Components Solar Panel Profiles Piping Options DN16 Duo Pipe DN20 Pipe Stainless Tails Copper Solar Fluid 8...

Страница 9: ...Mounting Options Optional Accessories Installation Hose Mounting Set Over Voltage Lightning 3 4 Thermostatic Mixing Valve Cooling Vessel Discharge Vessel 9 NAVITAS IN ROOF installation manual...

Страница 10: ...nel mbar Vissolis 4 Panel mbar Vissolis 6 Panel mbar 2 120 15 8 54 1 18 4 11 3 180 15 12 57 2 87 10 74 4 240 15 17 08 2 36 8 22 5 300 22 21 11 4 05 14 58 6 360 22 25 14 5 74 20 94 8 240 22 33 68 6 92...

Страница 11: ...oof fixing kits for metal and other commercial roofs Two options available utilise appropriate clamps so the fabric of the metal roof is not penetrated see page xx Note the minimum and maximum distanc...

Страница 12: ...Overview of materials Single row R1 double multiple row R2 12...

Страница 13: ...13 NAVITAS IN ROOF installation manual...

Страница 14: ...Overview of materials Single row R1 14...

Страница 15: ...15 NAVITAS IN ROOF installation manual...

Страница 16: ...Overview of materials Double multiple row R2 16...

Страница 17: ...Overview of tools 17 NAVITAS IN ROOF installation manual...

Страница 18: ...Mounting Single row R1 18...

Страница 19: ...19 NAVITAS IN ROOF installation manual...

Страница 20: ...Mounting Single row R1 20...

Страница 21: ...21 NAVITAS IN ROOF installation manual...

Страница 22: ...Mounting Single row R1 22...

Страница 23: ...23 NAVITAS IN ROOF installation manual...

Страница 24: ...Mounting Single row R1 24...

Страница 25: ...25 NAVITAS IN ROOF installation manual...

Страница 26: ...Mounting Single row R1 26...

Страница 27: ...27 NAVITAS IN ROOF installation manual...

Страница 28: ...Mounting Single row R1 28...

Страница 29: ...29 NAVITAS IN ROOF installation manual...

Страница 30: ...Mounting Single row R1 30...

Страница 31: ...31 NAVITAS IN ROOF installation manual...

Страница 32: ...Mounting Single row R1 32...

Страница 33: ...33 NAVITAS IN ROOF installation manual...

Страница 34: ...In roof installation Double multiple row R2 34...

Страница 35: ...35 NAVITAS IN ROOF installation manual...

Страница 36: ...In roof installation Double multiple row R2 36...

Страница 37: ...37 NAVITAS IN ROOF installation manual...

Страница 38: ...In roof installation Double multiple row R2 38...

Страница 39: ...39 NAVITAS IN ROOF installation manual...

Страница 40: ...In roof installation Double multiple row R2 40...

Страница 41: ...41 NAVITAS IN ROOF installation manual...

Страница 42: ...In roof installation Double multiple row R2 42...

Страница 43: ...Stainless Steel Pipe Specification Silicone Cable Specification Insulation Specification Specifications 43 NAVITAS IN ROOF installation manual...

Страница 44: ...8 Insulating EPP box cover Connections of flow and return pipe work to the pump station are made vis the flat face thread connection on all points apart from the connection directly underneath the pum...

Страница 45: ...the pump station consideration should be given to future access for maintenance It is best practice to locate the pump as far downstream the system as possible away from the collectors to help reduce...

Страница 46: ...ould be located at least 100 mm from in sulated pipes which may become hot during operation Control panels use PT1000 sensors containing twin core copper cable with a 0 75mm cross section The sen sors...

Страница 47: ...47 NAVITAS IN ROOF installation manual...

Страница 48: ...48...

Страница 49: ...49 NAVITAS IN ROOF installation manual...

Страница 50: ...Commissioning 50...

Страница 51: ...e until the desired flow rate is achieved Stop the pump Turning The Solar Pump On Manually For Service Press the left or down button the controller until the screen displays the time Press and hold th...

Страница 52: ...ass of the refractometer will display the level of antifreeze in the system If the antifreeze has lost its antifreeze properties the system should be refilled with fresh solar fluid It is recommended...

Страница 53: ...of inspection Expansion vessel setting before filling System pressure Expansion vessel setting before filling Flow rate Antifreeze level pH reading Inspection of barium get ter on tubes Engineer deta...

Страница 54: ...54...

Страница 55: ...55 NAVITAS IN ROOF installation manual...

Страница 56: ...E info joule ie W www joulesolutions ie JOULE UK A Newport Business Park Newbridge Road Ellesmere Port Cheshire CH65 4LZ T t 44 0 1513 551 094 F 44 0 1513 568 336 E info jouleuk co uk W www jouleuk c...

Отзывы: