background image

 

 MAINTENANCE 

Check battery in clock module (is the clock displaying the correct time?) 

 

TROUBLESHOOTING 

 

 
- Check whether the valve has been rotated manually! This could interfere with the programmed OPEN and CLOSE times, i.e. the OPEN 
times could become the CLOSE times and visa versa.  

????

 

 

Check supply voltage  

????

 

 

Check pressure

 

Содержание Air-Saver 1"

Страница 1: ...ith types of fluids or gasses as stated in its documentation Usage of this product in conditions not specified in the product documentation or contrary to the instructions hereby provided is considered IMPROPER The manufacturer will not be held liable for any damages resulting from improper use of the product ATTENTION Observe valid and generally accepted safety rules when planning installing and ...

Страница 2: ...________________________________________________ Motorised Ballvalves usually operate in any mounting position We recommend however that the valve is mounted according to these drawings ______________________________________________________________________________________________________ Minimum space required around the unit is 100 mm ______________________________________________________________...

Страница 3: ... the day 8 Mon 1 Tue 2 We 3 Form time blocks Mon Fri 1 2 3 4 5 Mon Sat 1 2 3 4 5 6 Mon Sun 1 2 3 4 5 6 7 The day must be set otherwise the switching point will not be activated 4th Step By pressing the 9 key you save the switching point data and go on to the next switching point CLOSE The display will show You can now set the time and day for closing the valve By pressing the 9 key you save the sw...

Страница 4: ...nd CLOSE will become OPEN Air Saver 1 housing Figure 1 Air Saver 2 housing Figure 2 Note On the 2 version figure 2 you can manually open close the valve by turning the knob on top of the actuator TECHNICAL SPECIFICATIONS Power supply 115VAC or 230VAC see label Power consumption 7W during the opening and closing of valve Opening closing time 30 seconds 90º for the 1 version 105 seconds 90º for the ...

Страница 5: ...n the top cover Identify the remote switching cable sides Slide the remote switching cable through the cable gland Connect the RED remote cable with the RED cable of point 3 Slide the RED cable back into its place marked with the number 3 Connect the BLUE remote cable with the BROWN cable of point 5 ...

Страница 6: ...ct the BLACK remote cable with the GREY cable of point 4 Slide the BLACK GREY cables back into its place mark with the number 4 Slide the BROWN remote cable onto point 5 A complete look at the cable set up Tighten the 4 screws and the cable gland ...

Страница 7: ...k displaying the correct time TROUBLESHOOTING Check whether the valve has been rotated manually This could interfere with the programmed OPEN and CLOSE times i e the OPEN times could become the CLOSE times and visa versa Check supply voltage Check pressure ...

Отзывы: