6. During operation
6.1. Operate the crane
4
3
2
1
Lifting should be carried out in the following order:
1. Lift the load.
2. Move load closer to the crane.
3. Slew the crane
4. Lower the load.
WARNING
• Never go below a hanging load or move a load over people.
• The crane may not be used for lifting personnel
Comply with the values listed on the load plate; do not overload the crane.
Do not lift a load over yourself or the cab
• Never drive the cylinders to their extreme positions at full speed.
• Never operate the stabiliser system while the crane is loaded.
• Make sure that the weight of the load and the vehicle does not rest only on the stabiliser system.
Adjust the stabiliser leg if necessary.
• Do not load from in front of the vehicle: You risk to tilt the vehicle!