Jolywood HD108N Скачать руководство пользователя страница 9

①frame     ②clip     ③ M8 bolt      ④mounting rail 

5.2    Installation method

5.2.1 Mechanical installation and 

         precautions

5.2.2   Framed Bifacial Double-Glass 

Modules (installation with clamps)

Clamp:

9

Jolywood (Taizhou) Solar Technology Co.,Ltd.

Kaiyang Rd., Jiangyan Economic Development zone, Taizhou City, Jiangsu Province, P. R. China

www.jolywood.cn

 [email protected]

 +86-523-8061 2361

Installation Manual

 - Jolywood N-type Mono-crystalline Double Glass Module

5.1.6

Do  not  damage  the  back  glass  of  module  when 
modules  mounted  on  the  bracket.  If  modules 
need  to  be  replaced,  do  not  damage  the 
surrounding modules or mounting structure.

5.1.7

When installing modules, do not work alone, and 
keep working with a team of two or more men.

5.1.8

After modules are installed, the cables should be 
fixed  or  tied  to  avoid  exposed  under  direct 
sunlight  after  installation,  which  would  prevent 
cable from aging. Low-hanging cables can cause 
various  problems,  such  as  electric  leakage  and 
fire.

5.1.9

The  application  level  of  module  produced  by 
Jolywood is Class A. modules with different color 
should  be  avoided  from  installed  in  the  same 
array or roof.

Mounted with 4 clamps along long frame.                                                                                                          
C-shaped steel parallel to the long frame.                                                                                                          
Edge Clamp: width=40-50mm, 
height=30mm. A=350±30mm 
maximum test load: front ≤2400Pa  
back ≤2400Pa

snow  and  wind  loads)  depends  on  the  way  of 
module installed. The mechanical load should be 
calculated  by  the  professional  system  designer 
based  on  actual  conditions  and  environmental. 
Moreover,  it  does  not  withstand  the  excessive 
force generated by the thermal expansion of the 
support  structure.  The  drain  hole  should  not  be 
blocked under any conditions during installation 
or use.

Modules could be mounted with clamps or bolts. 
Modules  Installation  must  be  carried  out 
according  to  the  following  examples  and 
recommendations.  If  the  installation  method  is 
different  from  below  methods,  please  consult 
Jolywood local technical support or after-sales, to 
obtain the consent of Jolywood, otherwise when 
the modules is damaged, the limit warranty would 
be invalid.
The  mechanical  load  of  the  module  (including 

 

JW-HD108N/P 

Содержание HD108N

Страница 1: ...INSTALLATION MANUAL Jolywood N type Mono crystalline Double Glass Module M10 Double glass module HD108N P All rights reserved Jolywood Taizhou Solar Technology Co Ltd ...

Страница 2: ...tallation Installation Safety Mechanical installation and precautions Framed Bifacial Double Glass Modules installation with clamps Grounding Electrical installation Wiring Fuse Maintenance for PV Modules Module Visual Inspection and Replacement Connector and Cable Inspection Cleaning Water quality requirements Module Inspection after Cleaning Troubleshooting Technical Issues or Claims Framed Bifa...

Страница 3: ...sional knowledge and the system must be installed and maintained by qualified person with professional knowledge Please store this guide in a safe place for future reference maintenance which would also be useful when selling or disposing of the modules The module installer must inform the end customer or consumer of the above matters accordingly Jolywood reserves the right to change this installat...

Страница 4: ...by qualified person with professional knowledge Persons without authorization and relevant training should not touch modules and approach the installation area or module storage area Do not connect the positive terminal of a single module to the positive terminal of another module Please make sure that the polarity of each module or module string is not opposite to other modules or module strings P...

Страница 5: ...directly on the module during transportation Improper transportation or installation also may damage module which is excluded from the warranty Do not stand climb walk or jump on unpacked pallets of modules Always work under a dry environment ensure that all modules and electrical contacts are clean and dry before installation If it is necessary to store the modules outdoors for a certain period o...

Страница 6: ... on a relatively flat ground to avoid package damage or dumping due to ground deformation or collapse Storage requirements humidity 85 temperature range 40 50 If the modules need long distance transportation or long term storage do not remove the original packaging and keep the wrapping film and packaging carton intact If the module would be transported for a too long distance or stored for a long p...

Страница 7: ... fixed The ground needs to be flat enough to ensure package could be placed horizontally and stably Supportive tool should be used when disassembling the carton to prevent the modules from falling down 4 1 3 Wear protective gloves during unpacking to avoid injury and fingerprints on the glass surface 4 1 4 Module information could be queried from outer package please read it carefully before unpackin...

Страница 8: ... during installation Do not open the electrical connection or pull out the connector while the circuit is under load Do not touch the modules during installation unless necessary Glass surfaces and brackets may have high temperature which might lead to the risk of hazards of burns and electric shock The modules produced by Jolywood could installed landscape or portrait the influence of shading effec...

Страница 9: ...fire 5 1 9 The application level of module produced by Jolywood is Class A modules with different color should be avoided from installed in the same array or roof Mounted with 4 clamps along long frame C shaped steel parallel to the long frame Edge Clamp width 40 50mm height 30mm A 350 30mm maximum test load front 2400Pa back 2400Pa snow and wind loads depends on the way of module installed The mech...

Страница 10: ... 350 30mm maximum test load front 5400Pa back 2400Pa Mounted with 4 clamps along short frame C shaped steel parallel to the short frame Edge Clamp width 40 50mm height 30mm A 250 30mm maximum test load front 1200Pa back 1200Pa JW HD108N P JW HD108N P Mounted with 4 clamps along short frame Edge Clamp width 40 50mm height 30mm A 50 100mm maximum test load front 1200Pa back 1200Pa JW HD108N P Mounte...

Страница 11: ...he screw faces the frame mounting holes D The outer flat washer needs to use M8 A2 70 a stainless steel SUS304 flat washer with an outer diameter of 20 2 mm and a thickness of 1 1 1 2 mm the corresponding stainless steel spring washer thickness is 2 0 0 2mm B The modules are fastened at 8 points according to load requirements or installation requirements Four points on the long side C The tensile st...

Страница 12: ...lectrical contact is formed by penetrating the anodized coating of the aluminum frame and tightening the ground screw together with the star washer to an appropriate torque of 3 7N m A properly sized ground wire 4 16mm2 copper core wire should be selected and mounted under the connecting bolt Place the toothed washers washers and grounding wires in turn and screw the screws into the grounding hole...

Страница 13: ...age of modules shall not be higher than the maximum voltage borne by the system and factors such as the lowest expected temperature shall be considered It is recommended to calculate according to the following formula Maximum system voltage N x Voc x 1 Tcvoc x Tmin 25 Of which N represents the number of modules Voc represents the open circuit voltage of the component Tcvoc represents the temperatu...

Страница 14: ...1 4 If module is damaged glass breakage or scratches on the back glass it is need to be replaced Module must be replaced with same type one Do not touch the live parts of the cables or connectors when replacing modules Use appropriate safety guards insulation tools insulated gloves insulated boots etc when handling modules a The maximum rating of the fuse connected in series is 30A and the module ...

Страница 15: ...g The amount of electricity produced by a solar module is proportional to the amount of light reach on surface of it A dust covered module produces relatively lower power so it is important to keep module clean a The PV module should be cleaned under the irradiance of less than 200W m2 Avoiding cleaning water with great different temperature from air to avoid cracking Hard water needs to be softene...

Страница 16: ...e any questions about technology or claims please contact the installer Please visit http www jolywood cn to contact Jolywood after sales service team Please submit the Customer Feedback Information Form at http www jolywood cn Our technical service representatives will contact you within 5 working days The required username and password will be sent via the Customer Service link Please download t...

Отзывы: