
Zone Terminal
5
●
AHU, UNT, or VAV controller with 24VAC transformer
●
AS-ZTU100 Zone Terminal comes with a 6-pin telephone-style coiled
cord. Also included are four inserts: one Time Schedule Overlay
(remove the paper backing), and three clear inserts with set point labels
(remove protective plastic backing).
Note: The UNT/VAV inserts match common configurations right out of
the box. The ZT matches the most-used AHU configuration:
Mixed Air Single Path.
●
TE-6100 Zone Sensor
●
AS-FMK100 Function Module Kit
●
AS-RLY100 Relay Kit or M100C Actuator
●
AS-ZTUWMB Wall Mount Base
●
AS-ENC100 Enclosure
●
AS-ZTUUMB Utility Mounting Base With Screws
●
AS-ZTUBAG Carrying Case
●
AS-CBLPRO-1
●
IBM compatible computer or laptop
●
WS-SWHPRO-3 HVAC PRO Release 3
●
clear overhead transparency film for the customized inserts
●
AS-CBLCON-0 or AS-AHU101 and AS-FMK100
!
CAUTION: The ZT must be plugged into a
6-pin
telephone-type
jack. Plugging the ZT into an 8-pin jack destroys the
8-pin receptacle and prevents the ZT from powering
up.
Note: AS-CBLPRO-
1
must be used to download the ZT.
AS-CBLPRO-
0
is not compatible for downloading.
ZT configuration and downloading are done with a software program
called ZT PRO which is part of the HVAC PRO software, Rev. 3. This
easy-to-use tool configures, commissions, and downloads the ZT’s data
base. The program runs on an IBM® PC/XT/AT, PS/2, or any 100%
compatible computer. Figure 2 is an overview of the ZT configuration and
downloading process. Refer to the
HVAC PRO User’s Manual
for specific
information on configuration and downloading the Zone Terminal.
Required Hardware
for Operation
Optional Hardware
for Operation
Required for
Downloading
Software
Содержание Zone Terminal
Страница 2: ...2 Zone Terminal ...
Страница 12: ...12 Zone Terminal ...
Страница 22: ...22 Zone Terminal ...