ForM 160.75-N1 (309)
33
JohNSoN CoNtroLS
fig. 24 – tYPicial rEfrigErant VEnt PiPing
stop Valves
Stop valves may be provided (by others) in the
evaporator and condenser water piping adjacent to the
unit to facilitate maintenance. Thermometer wells and
pressure taps should be provided (by others) in the piping
as close to the unit as possible to facilitate operating
check.
flow switches
Thermal type water flow switches are factory mounted in
the chilled and condensed water nozzles and are factory
wired to the OptiView™ control panel. These solid-state
flow sensors have a small internal heating element and
use the cooling effect of the flowing fluid to sense when
an adequate flow rate has been established.
Waterbox drain and Vent Valves
Drain and vent valves (by others) should be installed
in the connections provided in the evaporator and
condenser liquid heads. These connections may be
piped to drain if desired.
checking Piping circuits and Venting air
After the water piping is completed, but before any water
box insulation is applied. Tighten and torque to maintain
between 30 and 60 ft. lbs. (41 and 81 N·m) the nuts on
the liquid head flanges. Gasket shrinkage and handling
during transit cause nuts to loosen. If water pressure is
applied before tightening is done, the gaskets may be
damaged and have to be replaced. Fill the chilled and
condenser water circuits, operate the pumps manually
and carefully check the evaporator and condenser water
heads and piping for leaks. Repair leaks as necessary.
before initial operation of the unit both water circuits
should be thoroughly vented of all air at the high
points.
rEfrigErant rEliEf PiPing
Each unit is equipped with pressure relief valves located
on the condenser and on the evaporator for the purpose
of quickly relieving excess pressure of the refrigerant
charge to the atmosphere as a safety precaution in case
of an emergency, such as fire.
Refrigerant relief vent piping (by others), from the relief
valves to the outside of the building, is required by code
in most areas and should be installed on all chillers. The
vent line should be sized in accordance with the ANSI/
ASHRAE-15, or local code.
The vent line must include
a dirt trap in the vertical leg to intercept and permit clean
out and to trap any vent stack condensation. The piping
MUST be arranged to avoid strain on the relief valves,
using a flexible connection, if necessary.
unit PiPing
Compressor lubricant piping and system external piping
are factory installed on all units shipped assembled. On
units shipped dismantled, the following piping should be
completed under the supervision of the Johnson Controls
representative: (1) the lubricant piping to oil sump and
oil evaporator and system oil return connections using
material furnished. See Form 160.75-N3.
FLANGED JoINt
to PErMIt PIPING
DISASSEMBLY
CoNDENSAtIoN
trAP
DUAL rELIEF
VALVES
VENt to AtMoSPhErE
SUPPort VENt PIPING to AVoID
StrAIN oN rELIEF PIPING
FLEXIBLE CoNNECtor
CoNDENSEr
CooLEr
SEE NotE
NotE:�ShELLS MAY BE FUrNIShED WIth
�
oNE or tWo rELIEF VALVES,
�
DEPENDING oN ShELL SIZE.
LD03863
EVAPorAtor
Содержание York MaxE YK Series
Страница 2: ...Page 2 of 2 ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 116: ...FORM 160 75 O1 309 17 JOHNSON CONTROLS 3 FIG 6 schematic drawing yk compressor lubrication system LD08577a ...
Страница 135: ...JOHNSON CONTROLS FORM 160 75 O1 309 36 SI metric conversion ...
Страница 137: ...JOHNSON CONTROLS FORM 160 75 O1 309 38 NOTES ...
Страница 138: ...FORM 160 75 O1 309 39 JOHNSON CONTROLS NOTES ...