FORM 160.75-O1 (309)
37
JOHNSON CONTROLS
P
R
O
C
E
D
U
R
E
D
A
IL
Y
W
E
E
K
L
Y
M
O
N
T
H
L
Y
Y
E
A
R
L
Y
O
T
H
E
R
Record
operating
conditions
(on
applicable
Log
Form)
X
Check
oil
levels
X
Check
refrigerant
levels
X
Check
oil
return
system
operation
X
Check
operation
of
motor
starter
X
Check
sump
heater
and
thermostat
operation
X
Check
three-phase
voltage
and
current
balance
X
Verify
proper
operation/setting/calibration
of
safety
controls
1
X
Verify
condenser
and
evaporator
water
flows
X
Leak
check
and
repair
leaks
as
needed
1
X
Check
and
tighten
all
electrical
connections
X
Megohm
motor
windings
X
Replace
oil
filter
and
oil
return
filter/driers
X
Clean
or
backflush
heat
exchanger
(VSD,
SSS
Applications)
X
Replace
starter
coolant
(VSD,
SSS
Applications)
X
Replace
or
clean
starter
air
filters
if
applicable
X
2
Perform
oil
analysis
on
compressor
lube
oil
1
X
Perform
refrigeration
analysis
1
X
Perform
vibration
analysis
X
Clean
tubes
X
2
Perform
Eddy
current
testing
and
inspect
tubes
2 - 5 Years
Lubricate
motor
Refer
to
motor
manufacturer’s
recommentations
For
operating
and
maintenance
requirements
listed
above,
refer
to
appropriate
service
literature,
or
contact
your
local
YORK
Se
rvice
Office.
1
This
procedure
must
be
performed
at
the
specified
time
interval
by
an
Industry
Certified
Technician
who
has
been
trained
and
qualified
to
work
on
this
type
of
YORK
equipment.
A
record
of
this
procedure
being
successfully
carried
out
must
be
maintained
on
file
by
the
equipment
owner
should
proof
of
adequate
maintenance
be
required
at
a
later
date
for
warranty
validation
purposes
.
2
More
frequent
service
may
be
required
depending
on
local
operating
conditions.
M
A
IN
T
E
N
A
N
C
E
R
E
Q
U
IR
E
M
E
N
T
S
F
O
R
Y
O
R
K
Y
K
C
H
IL
L
E
R
S
Form
160.54-MR1
(801)
LD13598
Содержание York MaxE YK Series
Страница 2: ...Page 2 of 2 ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 116: ...FORM 160 75 O1 309 17 JOHNSON CONTROLS 3 FIG 6 schematic drawing yk compressor lubrication system LD08577a ...
Страница 135: ...JOHNSON CONTROLS FORM 160 75 O1 309 36 SI metric conversion ...
Страница 137: ...JOHNSON CONTROLS FORM 160 75 O1 309 38 NOTES ...
Страница 138: ...FORM 160 75 O1 309 39 JOHNSON CONTROLS NOTES ...