PEAK® OEM 18 240 Volt SMART Equipment Controller Installation Instructions
3
•
Do not mount the controller in areas where electromagnetic emissions from other devices or wiring can
interfere with controller communication.
Observe these additional guidelines when mounting a field controller in a panel or enclosure:
•
Mount the controller so that the enclosure walls do not obstruct cover removal or ventilation through the
controller.
•
Mount the controller so that the power transformer and other devices do not radiate excessive heat to the
controller.
•
Do not install the controller in an airtight enclosure.
•
Use a zip tie to secure the controller when shipping.
Figure 1: PEAK OEM 18 240 Volt Controller Mounting Position
DIN Rail Mount Applications
Mounting the field controller horizontal on 35 mm DIN rail is the preferred mounting method.
To mount a field controller on 35 mm DIN rail:
1.
Securely mount a 20 cm (8 in.) or longer section of 35 mm DIN rail horizontal and centered in the desired space,
so that the controller mounts in the horizontal position shown in Figure 1.
2.
Pull the two bottom-mounting clips outward from the controller to the extended position.
3.
Hang the controller on the DIN rail by the hooks at the top of the (DIN rail) channel on the back of the controller,
and position the controller snugly against the DIN rail.
4.
Zip-tie the controller to the DIN rail (when shipping).
5.
Push the bottom mounting clips inward (up) to secure the controller on the DIN rail.
Horizontal Mount Position
Required for DIN Rail Mounting