IM-459000
A s s e m b l y
7
5. a. HPL402 only– Attach the actuator to the
mast and the motor end to the boom with
hardware. (Fig. 5)
b. P-C-HLA-2– Attach top of actuator to the
boom and motor end to the mast.
6. Cradle Attachment
(Fig. 6)
a. Remove nut and bolt from cradle.
b. Hold cradle in position at the end of the
boom and align the holes of the pin and cap
with the holes in the boom end fork.
c. P-C-HLA-2 only– Insert supplied bolt and
washer through boom fork, cradle cap and
pin. Washers must be placed on the outside
of the fork under bolt head and under the
nut. Place nut on bolt and secure tightly.
d. HPL402– Attach cradle with hardware.
e. Swivel cradle to check for free movement.
(HPL402 only - Pull vinyl boot over connec-
tion, making sure middle rib is over hardware).
Inside center attachment points on cradle are
used only for Hoyer slings with chains or
straps. The four outside attachments points are
used for Hoyer 4-point slings.
The large thrust washer must be inserted on
the cradle hanger post as shown in Figure 7. If
washer is not present, the cradle hanger post
and cradle center may wear prematurely. Worn
cradle parts could fail, resulting in injury to
resident/caregiver. Hanger post should protrude
cradle center by 1/16
th
inch.
8. Attach the power unit control box to bracket on
back of mast. Attach battery pack to control box
and bracket. (HPL402 only– route actuator cable
along mast and secure with clips provided. Make
sure to leave approximately 8 inches of cable
prior to the top clip to allow for maximum lifter
articulation). Plug cords in proper outlets,
pressing firmly into place (Fig. 8).
Figure 5
Figure 6
Figure 7
Figure 8
Содержание Hoyer HPL402
Страница 1: ...Power Patient Lifters P C HLA 2 HPL402 User Instruction Manual Warranty Hoyer Hoyer ...
Страница 2: ......
Страница 5: ...IM 459000 M o d e l s 5 MODELS P C HLA 2 HPL402 ...
Страница 15: ......