GIG
22
3)
Fit the rear panel 1 to the boiler with the nuts and washers
2
and
3
.
4)
Fit instrument panel
7
to cover
8
, passing the various wires through the hole. Before fitting the cover to the
boiler pass the feeding wire
A
and the burner wire
B
through the appropriate holes and fix by using the
wire holders
10
as supplied in the electrical panel (fig. 5).
5)
Threads any sensors into the appropriate openings (fig. 5).
6)
Complete the job by fitting the front panel
9
onto the boiler (fig. 5).
Fig. 5