GIG
21
INSTRUCTIONS FOR FITTING THE COVER AND INSTRUMENT PANEL TO THE
"GIG"
BOILER
1)
Unscrew nuts
1
,
2
and
3
and loosen nuts
4
and
5
(fig. 3).
2)
Fit the right hand slots of the front / lower metal plate
A
between the boiler walls and nuts
4
and
5
.
Once they are in position fix everything into place by tightening nuts
2
,
3
,
4
and
5
(fig. 4).
Fig. 3
Fig. 4